[1] |
崔福博, 郭剑波, 荆平, 等. 直流输电与直流电网直流配电技术综述[J]. 电网技术, 2014, 38(3):556-564 CUI Fubo, GUO Jianbo, JING Ping, et al. A review of DC power distribution technology[J]. Power System Technology, 2014, 38(3):556-564
|
[2] |
汤广福, 罗湘, 魏晓光. 多端直流输电与直流系统技术[J]. 中国电机工程学报, 2013, 33(10):8-17 TANG Guangfu, LUO Xiang, WEI Xiaoguang. Multi-terminal HVDC and DC-grid technology[J]. Proceedings of the CSEE, 2013, 33(10):8-17
|
[3] |
姚良忠, 吴婧, 王志冰, 等. 未来高压直流电网发展形态分析[J]. 中国电机工程学报, 2014, 34(34):6007-6020 YAO Liangzhong, WU Jing, WANG Zhibing, et al. Multi-terminal HVDC and DC-grid technology[J]. Proceedings of the CSEE, 2014, 34(34):6007-6020
|
[4] |
韩亮, 白小会, 陈波, 等. 张北±500 kV柔性直流电网换流站控制保护系统设计[J]. 电力建设, 2017, 38(3):42-47 HAN Liang, BAI Xiaohui, CHEN Bo, et al. Control and protection system design of Zhangbei ±500 kV converter station in VSC-HVDC power grid[J]. Electric Power Construction, 2017, 38(3):42-47
|
[5] |
李英彪, 卜广全, 王姗姗, 等. 张北柔直电网工程直流线路短路过程中直流过电压分析[J]. 中国电机工程学报, 2017, 37(12):3391-3399 LI Yingbiao, BU Guangquan, WANG Shanshan, et al. Analysis of DC overvoltage caused by DC short-circuit fault in Zhangbei VSC-based DC grid[J]. Proceedings of the CSEE, 2017, 37(12):3391-3399
|
[6] |
舒印彪, 张智刚, 郭剑波, 等. 新能源消纳关键因素分析及解决措施研究[J]. 中国电机工程学报, 2017, 37(1):1-8 SHU Yinbiao, ZHANG Zhigang, GUO Jianbo, et al. Study on key factors and solution of renewable energy accommodation[J]. Proceedings of the CSEE, 2017, 37(1):1-8
|
[7] |
International Renewable Energy Agency. Planning for the renewable future[R]. 2017.
|
[8] |
曹阳, 黄越辉, 袁越. 基于时序仿真的风光容量配比分层优化算法[J]. 中国电机工程学报, 2015, 35(5):1072-1078 CAO Yang, HUANG Yuehui, YUAN Yue, et al. Stratified optimization algorithm for optimal proportion of wind and solar capacity based on time sequence simulation[J]. Proceedings of the CSEE, 2015, 35(5):1072-1078
|
[9] |
MWEEICK J H. On representation of temporal variability in electricity capacity planning models[J]. Energy Economics, 2016, 59:261-274.
|
[10] |
ZONG W G. Size optimization for a hybrid photovoltaic-wind energy system[J]. Electric Power and Energy Systems, 2012, 42:448-451.
|
[11] |
MOHAMMED A, MARIO C, GIUSEPPE S, et al. Multicriteria optimal sizing of photovoltaic-wind turbine grid connected systems[J]. IEEE Trans on Energy Conversion, 2013, 28(2):370-379.
|
[12] |
姚天亮, 吴兴全, 李志伟, 等. 计及多约束条件的风光互补容量配比研究[J]. 电力系统保护与控制, 2017, 45(9):126-132 YAO Tianliang, WU Xingquan, LI Zhiwei. Research on complementary capacity ratio of wind power and photovoltaic considering multiple constraints[J]. Power System Protection and Control, 2017, 45(9):126-132
|
[13] |
宋洪磊, 吴俊勇, 冀鲁豫, 等. 风光互补独立供电系统的多目标优化设计[J]. 电工技术学报, 2011, 26(7):104-111 SONG Honglei, WU Junyong, JI Luyu, et al. Multi-objective optimal sizing of stand-alone hybrid wind/PV system[J]. Transactions of China Electrotechnical Society, 2011, 26(7):104-111
|
[14] |
曾鸣, 杨雍琦, 王雨晴, 等. 基于蒙特卡罗方法的电力系统电源侧协调规划模拟仿真研究[J]. 华北电力大学学报, 2016, 43(5):94-104 ZENG Ming, YANG Yongqi, WANG Yuqing, et al. Generation side coordinative power system planning simulation based on Monte Carlo method[J]. Journal of North China Electric Power University, 2016, 43(5):94-104
|
[15] |
BEDDARD A, BARNES M, PREECE R. Comparison of detailed modeling techniques for MMC employed on VSC-HVDC schemes[J]. IEEE Transactions on Power Delivery, 2014, 30(2):579-589.
|
[16] |
李驰, 刘纯, 黄越辉, 等. 基于波动特性的风电出力时间序列建模方法研究[J]. 电网技术, 2015, 39(1):208-214 LI Chi, LIU Chun, HUANG Yuehui, et al. Study on modeling method of wind power time series based on fluctuation characteristics[J]. Power System Technology, 2015, 39(1):208-214
|
[17] |
LI C, LI C, HUANG Y H, et al. Research on analysis method for photovoltaic power considering weather type[C]//International Conference on Renewable Power Generation. 2015:5-10.
|
[18] |
FU Y, WANG C H, TIAN W, et al. Integration of large-scale offshore wind energy via VSC-HVDC in day-ahead scheduling[J]. IEEE Trans on Sustainable Energy, 2016, 7(2):535-545.
|
[19] |
徐飞, 陈磊, 金和平, 等. 抽水蓄能电站与风电的联合优化运行建模及应用分析[J]. 电力系统自动化, 2013, 37(10):149-154 XU Fei, CHEN Lei, JIN Heping, et al. Modeling and application analysis of optimal joint operation of pumped storage power station and wind power[J]. Automation of Electric Power Systems, 2013, 37(10):149-154
|
[20] |
RICHARD E R. GAMS-A user's guide[R]. Washington DC:GAMS Development Corporation, 2014.
|
[21] |
韩民晓, ABDALLA O H. 可变速抽水蓄能发电技术应用与进展[J]. 科技导报, 2013, 31(16):69-75 HAN Minxiao, ABDALLA O H. Progress in the power generation technology with variable speed pump storage and its applications[J]. Science & Technology Review, 2013, 31(16):69-75
|
[22] |
丁明, 楚明娟, 毕锐, 等. 基于序贯蒙特卡洛随机生产模拟的风电接纳能力评价方法及应用[J]. 电力自动化设备, 2016, 36(9):67-73 DING Ming, CHU Mingjiao, BI Rui, et al. Wind power accommodation capability evaluation based on sequential Monte Carlo probabilistic production simulation and its application[J]. Electric Power Automation Equipment, 2016, 36(9):67-73
|
[23] |
李驰. 基于波动特性的新能源出力时间序列建模方法研究[D]. 北京:中国电力科学研究院, 2015:67-72. Li Chi. Study on modeling method of new energy power time series based on fluctuation characteristics, 2015:67-72.
|