[1] 舒印彪, 陈国平, 贺静波, 等. 构建以新能源为主体的新型电力系统框架研究[J]. 中国工程科学, 2021, 23(6): 61–69 SHU Yinbiao, CHEN Guoping, HE Jingbo, et al. Building a new electric power system based on new energy sources[J]. Strategic Study of CAE, 2021, 23(6): 61–69 [2] 李明节, 陈国平, 董存, 等. 新能源电力系统电力电量平衡问题研究[J]. 电网技术, 2019, 43(11): 3979–3986 LI Mingjie, CHEN Guoping, DONG Cun, et al. Research on power balance of high proportion renewable energy system[J]. Power System Technology, 2019, 43(11): 3979–3986 [3] 朱罡, 李延和, 张真, 等. 省级电网全清洁能源供电运行控制技术与应用[J]. 中国电力, 2021, 54(5): 195–205 ZHU Gang, LI Yanhe, ZHANG Zhen,et al. Operation control technology and application of all-clean energy power supply in provincial power grid[J]. Electric Power, 2021, 54(5): 195–205 [4] 国家能源局. 抽水蓄能中长期发展规划(2021—2035年)[EB/OL]. (2021-09-17) [2022-01-10]. http://zfxxgk.nea.gov.cn/1310193456_16318589869941n.pdf. [5] 国家发展和改革委员会. 关于加快推动新型储能发展的指导意见[EB/OL]. (2021-07-15)[2022-01-10]. https://www.ndrc.gov.cn/xxgk/zcfb/ghxwj/202107/t20210723_1291321.html?code=&state=123. [6] 国家能源局. 电力并网运行管理规定[EB/OL]. (2021-12-21)[2022-01-10]. http://zfxxgk.nea.gov.cn/2021-12/21/c_1310391369.htm. [7] 国家能源局. 电力辅助服务管理办法[EB/OL]. (2021-12-21)[2022-01-10]. http://zfxxgk.nea.gov.cn/2021-12/21/c_1310391161.htm. [8] 李相俊, 马会萌, 姜倩. 新能源侧储能配置技术研究综述[J]. 中国电力, 2022, 55(1): 13–25 LI Xiangjun, MA Huimeng, JIANG Qian. Review of energy storage configuration technology on renewable energy side[J]. Electric Power, 2022, 55(1): 13–25 [9] 施琳, 罗毅, 涂光瑜, 等. 考虑风电场可调度性的储能容量配置方法[J]. 电工技术学报, 2013, 28(5): 120–127,134 SHI Lin, LUO Yi, TU Guangyu, et al. Energy storage sizing method considering dispatchability of wind farm[J]. Transactions of China Electrotechnical Society, 2013, 28(5): 120–127,134 [10] MICHIORRI A, LUGARO J, SIEBERT N, et al. Storage sizing for grid connected hybrid wind and storage power plants taking into account forecast errors autocorrelation[J]. Renewable Energy, 2018, 117: 380–392. [11] 徐衍会,徐宜佳. 平抑风电波动的混合储能容量配置及控制策略[J]. 中国电力, 2022, 55(6): 186–193 XU Yanhui, XU Yijia. Capacity configuration and control strategy of hybrid energy storage to smooth wind power fluctuations[J]. Electric Power, 2022, 55(6): 186–193 [12] 李建林, 牛萌, 周喜超, 等. 能源互联网中微能源系统储能容量规划及投资效益分析[J]. 电工技术学报, 2020, 35(4): 874–884 LI Jianlin, NIU Meng, ZHOU Xichao, et al. Energy storage capacity planning and investment benefit analysis of micro-energy system in energy interconnection[J]. Transactions of China Electrotechnical Society, 2020, 35(4): 874–884 [13] 许周, 孙永辉, 谢东亮, 等. 计及电/热柔性负荷的区域综合能源系统储能优化配置[J]. 电力系统自动化, 2020, 44(2): 53–59 XU Zhou, SUN Yonghui, XIE Dongliang, et al. Optimal configuration of energy storage for integrated region energy system considering power/thermal flexible load[J]. Automation of Electric Power Systems, 2020, 44(2): 53–59 [14] 张旭,李阳,刘晓,等. 含高渗透率新能源的新型交直流储能系统的配电网规划[J]. 南方电网技术, 2022, 16(4): 60–67 ZHANG Xu, LI Yang, LIU Xiao, et al. Distribution network planning of new AC /DC energy storage system with high penetration new energy[J]. Southern Power System Technology, 2022, 16(4): 60–67 [15] 杨军峰, 郑晓雨, 惠东, 等. 储能技术在送端电网中促进新能源消纳的容量需求分析[J]. 储能科学与技术, 2018, 7(4): 698–704 YANG Junfeng, ZHENG Xiaoyu, HUI Dong, et al. Capacity demand analysis of energy storage in the sending-side of a power grid for accommodating large-scale renewables[J]. Energy Storage Science and Technology, 2018, 7(4): 698–704 [16] 李湃, 方保民, 祁太元, 等. 基于源-荷匹配的区域电网风/光/储容量配比优化方法[J]. 中国电力, 2022, 55(1): 46–54 LI Pai, FANG Baomin, QI Taiyuan, et al. Capacity proportion optimization of wind, solar power and battery energy storage system for regional power grid based on source-load matching[J]. Electric Power, 2022, 55(1): 46–54 [17] 任大伟, 金晨, 肖晋宇, 等. 计及灵活性基于时序的“十四五”储能需求分析[J]. 中国电力, 2021, 54(8): 190–198 REN Dawei, JIN Chen, XIAO Jinyu, et al. Demand analysis of energy storage for the 14 th five-year plan period based on time series considering power system flexibility[J]. Electric Power, 2021, 54(8): 190–198 [18] 任大伟, 金晨, 侯金鸣, 等. 基于时序运行模拟的新能源配置储能替代火电规划模型[J]. 中国电力, 2021, 54(7): 18–26 REN Dawei, JIN Chen, HOU Jinming, et al. Planning model for renewable energy with energy storage replacing thermal power based on time series operation simulation[J]. Electric Power, 2021, 54(7): 18–26 [19] 朱俊澎, 施凯杰, 李强, 等. 考虑输电网潮流约束的时序生产模拟及新能源消纳能力评估[J]. 电网技术, 2022, 46(5): 1947–1955 ZHU Junpeng, SHI Kaijie, LI Qiang, et al. Time series production simulation and renewable energy accommodation capacity evaluation considering transmission network power flow constraints[J]. Power System Technology, 2022, 46(5): 1947–1955 [20] 贺海磊, 张彦涛, 孙骁强, 等. 考虑频率安全约束的西北电网新能源开发及直流外送规模评估方法[J]. 中国电机工程学报, 2021, 41(14): 4753–4762 HE Hailei, ZHANG Yantao, SUN Xiaoqiang, et al. Evaluation method of renewable energy development scale and DC transmission scale of China northwest power grid by considering frequency security constraints[J]. Proceedings of the CSEE, 2021, 41(14): 4753–4762 [21] 代倩, 吴俊玲, 秦晓辉, 等. 提升局部区域新能源外送能力的储能容量优化配置方法[J]. 电力系统自动化, 2022, 46(3): 67–74 DAI Qian, WU Junling, QIN Xiaohui, et al. Optimal configuration method of energy storage capacity for improving delivery ability of renewable energy in regional area[J]. Automation of Electric Power Systems, 2022, 46(3): 67–74 [22] 破解湖南中长期电力供应难题, 宁电入湘工程按下“快进键”[EB/OL]. (2021-10-17) [2022-02-11]. https://baijiahao.baidu.com/s?id=1713846277725890934&wfr=spider&for=pc. [23] 宁夏回族自治区发展和改革委员会. 关于加快促进自治区储能健康有序发展的通知(征求意见稿)[EB/OL]. (2021-05-08)[2022-02-15]. http://fzggw.nx.gov.cn/tzgg/202105/t20210508_2829214.html.
|