[1] 李再华,白晓民,周子冠,等. 电网覆冰防治方法和研究进展[J]. 电网技术,2008,32(4):7-13. LI Zaihua, BAI Xiaomin, ZHOU Ziguan, et al. Prevention and treatment methods of ice coating in power networks and its recent study[J]. Power System Technology, 2008, 32(4):7-13.
[2] 张文亮,于永清,宿志一,等. 湖南电网2008年冰雪灾害调研分析[J]. 电网技术,2008,32(8):1-5. ZHANG Wenliang, YU Yongqing, SU Zhiyi, et al. Investigation andanalysis of icing and snowing disaster happened in Hunan power grid in 2008[J]. Power System Technology, 2008, 32(8):1-5.
[3] 孙才新,蒋兴良,熊启新,等. 导线覆冰及其干湿增长临界条件分析[J]. 中国电机工程学会会议,2003,23(3):141-145. SUN Caixin, JIANG Xingliang, XIONG Qixin, et al. Analysis of criticalicing conditions of conductor and wet-dry grown[J]. Proceedings of the CSEE, 2003, 23(3):141-145.
[4] 武守远,荆平. 输电线路直流融冰关键技术[M]. 北京:中国电力出版社,2014.
[5] 李庆峰,范峥,吴穹,等. 全国输电线路覆冰情况调研及事故分析[J]. 电网技术,2008,32(9):33-36. LI Qingfeng, FAN Zheng, WU Qiong, et al. Investigation of ice covered ransmission lines and analysis on transmission line failures caused by ice-coating in China[J]. Power System Technology, 2008, 32(9):33-36.
[6] 宿志一. 直流绝缘子串覆冰闪络特性[R]. 北京:中国电力科学研究院,2004.
[7] 陈义刚,范松海. 架空地线的绝缘化改造及融冰方法[J]. 四川电力技术,2012, 35(3):74-76. CHEN Yigang, FAN Songhai. Insulation reconstruction of overhead earth wire and ice melting method[J]. Sichuan Electric Power Technology, 2012, 35(3):74-76.
[8] 李本良,袁兆祥,惠旭,等. 降低高压交流输电线路避雷线损耗的运行方式[J]. 电网技术,2011,35(3):98-102. LI Benliang, YUAN Zhaoxiang, HUI Xu, et al. Operation mode of ground wire to reduce ground wire loss of HVAC transmission lines[J]. Power System Technology, 2011, 35(3):98-102.
[9] 赵丹丹,韩政,郭洁,等. 架空地线接地方式及损耗研究[J]. 高压电器,2013,49(2):67-73. ZHAO Dandan, HAN Zheng, GUO Jie, et al. Grounding models and electric loss of overhead ground wire[J]. High Voltage Apparatus, 2013, 49(2):67-73.
[10] 何金良,张波,曾嵘,等. 1000 kV特高压变电站接地系统的设计[J]. 中国电机工程学报,2009,29(7):7-12. HE Jinliang, ZHANG Bo, ZENG Rong, et al. Grounding system design of 1000 kV ultra-high voltage substation[J]. Proceedings of the CSEE, 2009, 29(7):7-12.
[11] 陈奎,曹晓斌,吴广宁,等. 超高压输电线路融冰绝缘地线单相短路电流分析[J]. 电网技术,2014,38(11):3266-3270. CHEN Kui, CAO Xiaobin, WU Guangning, et al. Analysis on single-phase short-circuit current in insulated ground wire during ice-melting of EHVAC transmission lines[J]. Power System Technology, 2014, 38(11):3266-3270.
[12] 宋立军,蒋陶宁,邹军,等. 特高压交流输电线路地线绝缘间隙电压的研究[J]. 电网技术,2013,37(3):686-691. SONG Lijun, JIANG Taoning, ZOU Jun, et al. Research on voltages across both terminals of ground wire insulation gap for UHVAC transmission line[J]. Power System Technology, 2013, 37(3):686-691.
[13] 王晓彤,班连庚,朱普轩,等. 750 kV同塔同窗同相序双回紧凑型线路的潜供电流和感应电压[J]. 电网技术,2011,35(1),90-96. WANG Xiaotong, BAN Liangeng, ZHU Puxuan, et al. Research on secondary-arc currents and induced voltages for 750 kV compact double-circuit transmission lines on the same tower with the same phase sequence in the same tower window[J]. Power System Technology, 2011, 35(1):90-96.
[14] 王巨丰,齐冲,车诒颖,等. 110 kV高压输电线路杆塔分流系数的研究[J]. 高电压技术, 2007,33(3):46-49. WANG Jufeng, QI Chong, CHE Yiying, et al. Research on lightning current shunt coefficient of tower on 110 kV high voltage transmission line[J]. High Voltage Engineering, 2007, 33(3):46-49.
[15] 陈奎,曹晓斌,吴广宁,等. 避雷线绝缘架设对杆塔雷电流分配的影响[J]. 电力自动化设备,2016,36(2):136-140. CHEN Kui, CAO Xiaobin, WU Guangning, et al. Impact of grounding wire insulation erection on lightning current shunting of tower[J]. Electric Power Automation Equipment, 2016, 36(2):136-140.
[16] 黄旭峰. 光纤复合架空地线接地方式的改进[J]. 高电压技术,2010,36(2):356-364. HUANG Xufeng. Improvement of the grounding method of OPGW[J]. High Voltage Engineering, 2010, 36(2):356-364.
[17] 徐望圣,严国志. 输电线路地线直流融冰技术与应用[M]. 武汉:武汉大学出版社,2015.
[18] 李特,周国良,刘岩,等. 220 kV玻璃绝缘子并联间隙雷电冲击放电路径研究[J]. 中国电力,2015,48(8):92-96. LI Te, ZHOU Guoliang, LIU Yan, et al. Lightning discharge character of shunt gap used for 220 kV glass insulator string[J]. Electric Power, 2015, 48(8):92-96.
[19] 陈丛丛,张小青. 雷电波的衰减与变形问题研究[J]. 中国电力,2013,46(12):12-15. CHEN Congcong, ZHANG Xiaoqing. Research on attenuation and distortion problems of lightning overvoltage[J]. Electric Power, 2013, 46(12):12-15.
[20] 端木林楠,余占清,彭珑,等. 多通道雷电流在线监测系统的研发和应用[J]. 中国电力,2015,48(2):49-51. DUANMU Linnan, YU Zhanqing, PENG Long, et al. Development and application of multi-channel lightning current on-line monitoring system[J]. Electric Power, 2015, 48(2):49-51.
[21] 方玉群,徐飞明,顾浩,等. 500 kV线路地线绝缘子间隙烧伤研究[J]. 中国电力,2015,48(7):153-160. FANG Yuqun, XU Feiming, GU Hao, et al. Research on parallel gap burn of ground wire insulator for 500 kV transmission lines[J]. Electric Power, 2015, 48(7):153-160. |