[1] 赵畹君. 高压直流输电工程技术[M]. 北京:中国电力出版社,2004. [2] 刘振亚. 特高压直流输电技术研究成果专辑[M]. 北京:中国电力出版社,2005. [3] 孙优良,王清璞,李文平,等. ±800 kV直流输电工程用换流变压器的研发[J]. 电力设备,2006,7(11):17-20. SUN Youliang, WANG Qingpu, LI Wenping, et al. R&D of converter transformer for ±800 kV HVDC power transmission project [J]. Electrical Equipment, 2006, 7(11): 17-20. [4] 吴云飞,胡惠然. 特大型电力变压器现场长时感应电压试验带局部放电测量技术研究[J]. 变压器,2010,47(4):29-31. WU Yunfei, HU Huiran. Technology research on field partial discharge test of extra large power transformer[J]. Transformer, 2010, 47(4): 29-31. [5] 伍衡,苏国磊,陈禾. 换流变压器局部放电试验时容性无功功率的计算[J]. 变压器,2014,51(1):4-8. WU Heng, SU Guolei, CHEN He. Calculation of capacitive wattles power of converter transformer in partial discharge test[J]. Transformer, 2014, 51(1): 4-8. [6] 谢超,孙勇. 800 kV特高压换流变压器现场局部放电试验[J].中国电力,2011,44(1):19-21. XIE Chao, SUN Yong. Field partial-discharge test for 800 kV UHVDC converter transformer[J]. Electric Power, 2011, 44(1): 19-21. [7] 吴云飞,汪涛,沈煜,等. 特高压换流变压器现场局部放电试验技术[J]. 高电压技术,2011,37(9):2140-2148. WU Yunfei, WANG Tao, SHRN Yu, et al. On-site partial discharge test technology of ultra high voltage converter transformer[J]. High Voltage Engineering, 2011, 37(9): 2140-2148. [8] 李福兴,郭森,黄华. 奉贤±800 kV换流站换流变压器现场局部放电试验[J]. 华东电力,2010,38(2):240-242. LI Fuxing, GUO Sen, HUANG Hua. In situ localized discharge test of converter transformer in FengXian ±800 kV ultra high voltage converter station[J]. East China Electric Power, 2010, 38(2): 240-242. [9] 程江平,陈禾,夏谷林,等. ±800 kV换流变压器现场长时感应耐压带局部放电试验测量试验研究[J]. 广东电力,2010,23(9):53-57. CHENG Jiangping, CHEN He, XIA Gulin, et al. Research on on-site long duration induced AC voltage and partial discharge test of 800 kV converter transformers[J]. Guangdong Electric Power, 2010, 23(9): 53-57. [10] 彭倩,聂德鑫,刘凡,等. 特高压换流变压器现场局部放电检测抗干扰技术[J]. 变压器,2013,50(7):50-54. PENG Qian, NIE Dexin, LIU Fan, et al. On-site partial discharge test anti-interference technology of UHV converter transformer [J]. Transformer, 2013, 50(7): 50-54. [11] 贾志杰,陈少卿,陈洪波,等. 超声波局部放电检测在GIS耐压试验的应用[J]. 中国电力,2013,46(12):29-32. JIA Zhijie, CHEN Shaoqing, CHEN Hongbo, et al. Application of ultrasonic partial discharge detection in GIS withstand voltage test [J]. Electric Power, 2013, 46(12): 29-32. [12] 谢超,孙勇. 800 kV特高压换流变压器现场局部放电试验[J].中国电力,2011,44(1):19-21. XIE Chao, SUN Yong. Field partial-discharge test for 800 kV UHVDC converter transformer[J]. Electric Power, 2011, 44(1):19-21. [13] 李光范,李金忠,李博,等. 特高压交流变压器现场感应电压试验及局部放电测量技术研究[C]//北京:2009 特高压输电技术国际会议,2009. LI Guangfan, LI Jinzhong, LI Bo, et al. Reasearch on on-site induction voltage test and partial discharge measurement technology for UHVAC transformer[C]// China: Memoir on 2009 International Conference on UHV Transmission Technology, 2009. [14] 罗维,吴云飞,沈煜,等. 1 000 kV 交流特高压变压器现场局部放电试验技术研究[C]//北京:2009 特高压输电技术国际会议, 2009. LUO Wei, WU Yunfei, SHEN Yu, et al. Research on on-stie partial discharge test of 1 000 kV UHVAC transformer[C]// China: Memoir on 2009 International Conference on UHV Transmission Technology, 2009. [15] 陈江波,聂德鑫,张曦,等. 特高压变压器现场局部放电试验分析[C]//北京:2009 特高压输电技术国际会议,2009. CHEN Jiangbo, NIE Dexin, ZHANG Xi, et al. Analysis on on-site partial discharge test of UHV transformer[C]//China: Memoir on 2009 International Conference on UHV Transmission Technology, 2009. |