中国电力 ›› 2015, Vol. 48 ›› Issue (1): 11-14.DOI: 10.11930.2015.1.11

• “十三五”电力规划 • 上一篇    下一篇

“十三五”输电网发展重点研究

韩丰,宋福龙,罗金山,路畅   

  1. 国网北京经济技术研究院,北京 102209
  • 收稿日期:2014-12-05 出版日期:2015-11-25 发布日期:2015-11-24
  • 作者简介:韩丰(1962—),女,北京人,高级工程师,从事电力系统规划相关研究工作。E-mail: hanfeng@chinasperi.sgcc.com.cn

Research on Development of Transmission Power Grid in 13th Five-Year Period

HAN Feng, SONG Fulong, LUO Jinshan, LU Chang   

  1. State Power Economic Research Institute, Beijing 102209, China
  • Received:2014-12-05 Online:2015-11-25 Published:2015-11-24

摘要: 十三五”是中国全面建成小康社会的关键时期,是实现能源电力发展方式转变的重要战略机遇期。根据中国“西电东送、北电南送”电力流特点,未来国家电网发展将呈现东北、西北、西南为送端,华北、华东、华中为受端的基本格局。在总结分析“十二五”国家电网发展成就的基础上,系统阐述了电网发展面临的形势和任务,提出“十三五”期间国家电网发展重点,要加快建设以特高压电网为骨干网架、各级电网协调发展的坚强智能电网,促进大型煤电、水电、核电、可再生能源基地集约开发,实施大规模、远距离输电,实现能源资源在全国范围优化配置,推动能源结构调整和布局优化,促进资源节约和生态环境保护,保障能源可持续安全供应。

关键词: 电网, 发展, 规划, 特高压, “十三五”规划

Abstract: The 13th Five-Year period is crucial for speeding up the energy and power development mode transitions. This article summarizes the main achievements of gird development during the 12th Five-Year Plan period, analyzes the situation and challenges of power grid development, and puts forward the ideas and major goals of power grid development in the 13th Five-Year Plan period. It also presents that power grid development should not only ensure power supplies for socio-economic development, but also enhance the grid itself and advocate clean and high efficient energy consumption. As China’s main power flows are transferred from west to east and from north to south, in the development plan of power grids affiliated to the State Grid the infrastructure will be demonstrated as the sending ends located at the Northeast, Northwest and Southwest China while the receiving ends at the North China, East China and Central China. The construction of strong smart grid should be accelerated with the UHV power grid as the mainstay and the coordinated development of power grids at all voltage-levels to promote intensive development of large-scaled coal, hydropower, nuclear power and renewable energy bases, implement large-scaled and long-distance power transmission and achieve optimal energy resources allocation nationwide.

Key words: power grid, development, planning, UHV, 13th Five-Year Plan

中图分类号: