[1] 毛育东. 全寿命周期费用视角下的配网企业成本管理研究[D]. 山东大学学位论文,2006.
MAO Yu-dong. Cost management research of power grid enterprise from the perspective of life cycle costs [D]. Shangdong University Master’s Thesis, 2006.
[2] 李泓泽,郎斌. 全寿命周期造价管理在电力工程造价管理中的应用研究[J]. 华北电力大学学报,2008,(1):7-11.
LI Hong-ze, LANG Bin. The application of the whole life cycle engineering cost management on the electricity engineering Field[J]. Journal of North China Electric Power University, 2008, (01): 7-11.
[3] 马丽,张建华,刘念,等. 城市配电网规划方案的多阶段综合评估方法[J]. 中国电力,2013,46(11):150-154.
MA Li, ZHANG Jian-hua, LIU Nian, et al . Multistage comprehensive evaluation of urban power distribution network planning[J].Electric Power, 2013, 46(11): 150-154.
[4] 易于,韦钢,杨嘉骏,等. 基于AHP群决策法的配电网规划方案综合决策[J]. 中国电力,2012,45(4):23-26.
YI Yu, WEI Gang, YANG Jia-jun, et al . Comprehensive decision making of distribution network planning based on group AHP[J].Electric Power, 2012, 45(4): 23-26.
[5] 徐翀.全寿命周期成本管理在电力设备管理中的应用探讨[J].中国电力,2010,43(3):72-74.
XU Chong. Research of the apphcatlon in power equipments LCC management [J]. Electric Power, 2010, 43(3): 72-74.
[6] 罗波,辛志胜,朱长明. 工程建设全寿命周期造价控制理论及其应用[J]. 华中科技大学学报,2006,23(SI):103-106.
LUO Bo, XIN Zhi-sheng, ZHU Changming. Theory of engineering construction lifecycle cost control and its application[J]. Journal of Huazhong University of Science and Technology, 2006, 23(SI):103-106.
[7] 沈京京.配网企业资产全寿命周期成本管理探索[J].华东电力,2008,36(12):122-124.
SHEN Jing-jing. Exploration of assets life cycle management for grid enterprises[J]. East China Electric Power, 2008, 36(12):122-124.
[8] 帅军庆. 电力企业资产全寿命周期管理[M]. 北京,中国电力出版社,2010.
SHUAI Jun-qing. Life cycle asset management in electric power enterprise [M]. Beijing, china power press, 2010.
[9] ZHI H. Simulation analysis in project life cycle cost[J]. Cost Engineering, 1993, 35(12): 212.
[10] 殷可,郁东升. 全寿命周期成本(LCC)在变电站主设备招标采购中的研究与实践[J]. 华东电力,2009,37(3):436-439.
YIN Ke, YU Dong-sheng. Application of life cycle cost to bid- invitation and purchase of main substation equipment[J]. East China Electric Power, 2009, 37(3): 436-439.
[11] 姜文瑾,陈海华,陆爽,等. 110 kV油变和箱变战略采购LCC研究与应用[J]. 华东电力,2008,36(12):100-103.
JIANG Wen-jin, CHEN Hai-hua, LU Shuang, et al . Study and application of LCC-based purchase strategies for 110 kV oil- immersed transformers and box transformers[J]. East China Electric Power, 2008,36(12):100-103.
[12] 梅志农,袁思吟. 上海世博变电站工程中的LCC实践[J]. 上海电力,2009(3):242-245.
MEI Zhi-nong, YUAN Si-yin. Application of LCC in the Shanghai expo substation project[J]. Shanghai Electric Power, 2009(3): 242-245.
[13] 崔海峰. 浅谈全寿命周期管理理念[J]. 科技情报开发与经济,2009,19(15):171-181.
CUI Hai-feng, Talking about the conception of total Life cycle management[J]. Sci-Tech Information Development & Economy, 2009, 19(15): 171-181.
[14] 李可,马孝义,邢化玲,等. 缺电损失评价的相关模型及算法研究[J]. 中国农村水利水电,2010,(3):146-147,151.
LI Ke, MA Xiao-yi, XING Hua-ling, et al . Estimation model of power outage cost and its method[J], China Rural Water and Hydropower, 2010, (3): 146-147, 151.
[15] 张小娟,李泽荣,张重远,等. 基于最小路法的配电网可靠性评估[J]. 电网与清洁能源,2010,8:24-28.
ZHANG Xiao-juan, LI Ze-rong, ZHANG Zhong-yuan, et al . Distribution system reliability assessment based on minimal path method [J]. DONG Jun-bo Power System and Clean Energy, 2010, 8: 24-28.
[16] GOEL L, BILLINTON R. Evaluation of interrupted energy assessment rates in distribution systems [J]. IEEE Transactions on Power Delivery, 1991, 6(4): 1876-1882.
[17] 王超,徐政. 中国用户停电损失调查方法[J]. 电网技术,2007,31(11):54-60.
WANG Chao, XU Zheng. Customer interruption costs investigation method for China[J]. Power System Technology, 2007, 31(11):54-60.
[18] 刘华勇,谢开贵,罗晓初,等. 计及可靠性的电力设备全寿命周期成本管理[J]. 供用电,2010,27(3):8-11.
LIU Hua-yong, XIE Kai-gui, LUO Xiao-chu, et al . Life cycle cost and its management for power equipments considering the reliability [J]. Distribution & Utilization, 2010, 27(3): 8-11. |