[1] 易俊, 卜广全, 郭强, 等. 巴西“3·21”大停电事故分析及对中国电网的启示[J]. 电力系统自动化, 2019, 43(2): 1-9 YI Jun, BU Guangquan, GUO Qiang, et al. Analysis on blackout in Brazilian power grid on March 21, 2018 and its enlightenment to power grid in China[J]. Automation of Electric Power Systems, 2019, 43(2): 1-9 [2] 曾辉, 孙峰, 李铁, 等. 澳大利亚“9·28”大停电事故分析及对中国启示[J]. 电力系统自动化, 2017, 41(13): 1-6 ZENG Hui, SUN Feng, LI Tie, et al. Analysis of “9·28” blackout in south Australia and its enlightenment to China[J]. Automation of Electric Power Systems, 2017, 41(13): 1-6 [3] 刘自发, 张在宝, 杨滨, 等. 电网大停电社会综合损失评估[J]. 电网技术, 2017, 41(9): 2928-2940 LIU Zifa, ZHANG Zaibao, YANG Bin, et al. Evaluation of great blackout social comprehensive loss of power grid[J]. Power System Technology, 2017, 41(9): 2928-2940 [4] CHEN B, CHEN C, WANG J, et al. Multi-time step service restoration for advanced distribution systems and microgrids[J]. IEEE Transactions on Smart Grid, 2018, 9(6): 6793-6805. [5] 方嵩, 彭嵩, 赵晋泉, 等. 分布式电源辅助电网黑启动研究综述[J]. 广东电力, 2019, 32(1): 20-28 FANG Song, PENG Song, ZHAO Jinquan, et al. Research overview of power grid black-start with the aid of distributed generation[J]. Guangdong Electric Power, 2019, 32(1): 20-28 [6] PAN Z J, ZHANG Y. A flexible black-start network partitioning strategy considering subsystem recovery time balance[J]. International Transactions on Electrical Energy Systems, 2015, 25(8): 1644-1656. [7] 孙磊, 张璨, 林振智, 等. 大停电后电力系统黑启动分区的两步策略[J]. 电力自动化设备, 2015, 35(9): 14-21 SUN Lei, ZHANG Can, LIN Zhenzhi, et al. Two-step strategy for black-start zone partitioning of power system after blackout[J]. Electric Power Automation Equipment, 2015, 35(9): 14-21 [8] 和敬涵, 李长城, 张沛, 等. 基于改进标签传播算法的电力系统并行恢复分区方法[J]. 电网技术, 2018, 42(6): 1776-1782 HE Jinghan, LI Changcheng, ZHANG Pei, et al. A partitioning method for power system parallel restoration based on modified label propagation algorithm[J]. Power System Technology, 2018, 42(6): 1776-1782 [9] 周光奇, 顾雪平, 马世英, 等. 基于整数线性规划的恢复子系统划分与分区方案的综合评价[J]. 电力自动化设备, 2019, 39(1): 91-98 ZHOU Guangqi, GU Xueping, MA Shiying, et al. Restoration subsystem division based on integer linear programming and comprehensive evaluation of dividing schemes[J]. Electric Power Automation Equipment, 2019, 39(1): 91-98 [10] 李振坤, 周伟杰, 钱啸, 等. 有源配电网孤岛恢复供电及黑启动策略研究[J]. 电工技术学报, 2015, 30(21): 67-75 LI Zhenkun, ZHOU Weijie, QIAN Xiao, et al. Distribution network restoration and black start based on distributed generators[J]. Transactions of China Electrotechnical Society, 2015, 30(21): 67-75 [11] 谢夏慧, 汪沨, 卢鸣凯, 等. 大停电后初期基于分布式电源的配电网局部自我恢复方案[J]. 电网技术, 2013, 37(7): 1834-1840 XIE Xiahui, WANG Feng, LU Mingkai, et al. A distributed generation-based local self-recovery scheme for distribution network at post-blackout early stage of power grid restoration[J]. Power System Technology, 2013, 37(7): 1834-1840 [12] 谢夏慧, 汪沨, 陈奇朋, 等. 含分布式电源的配电网关键负荷保障方法[J]. 电网技术, 2013, 37(5): 1447-1453 XIE Xiahui, WANG Feng, CHEN Qipeng, et al. A method to ensure power supply reliability for key load in distribution network containing distributed generation[J]. Power System Technology, 2013, 37(5): 1447-1453 [13] 张彩庆, 张文俊. 基于分块技术的用户停电损失估算方法研究[J]. 中国电力, 2013, 46(12): 136-140 ZHANG Caiqing, ZHANG Wenjun. Method for estimating user's power outage loss based on partition technology[J]. Electric Power, 2013, 46(12): 136-140 [14] WACKER G, BILLINTON R. Customer cost of electric service interruptions[J]. Proceedings of the IEEE, 1989, 77(6): 919-930. [15] 周莉梅, 范明天. 城市电网用户停电损失估算及评价方法研究[J]. 中国电力, 2006, 39(7): 70-73 ZHOU Limei, FAN Mingtian. Research on customer outage cost assessment and its evaluation method in urban electric power network[J]. Electric Power, 2006, 39(7): 70-73 [16] EL-BASSIOUNY A, EL-SHIMY M, HAMMOUDA R. Impact of power transformer failures on customer interruptions costs using customer damage functions [C]//2017 Nineteenth International Middle East Power Systems Conference (MEPCON), December 19-21, 2017. Cairo. IEEE, 2017: 565–570. [17] GOLSHANI A, SUN W, SUN K. Advanced power system partitioning method for fast and reliable restoration: toward a self-healing power grid[J]. IET Generation, Transmission & Distribution, 2018, 12(1): 42-52. [18] 刘仲, 牟龙华, 许旭锋. 微电网黑启动中考虑负荷恢复优化的分布式电源恢复方案[J]. 电力自动化设备, 2016, 36(3): 46-52 LIU Zhong, MU Longhua, XU Xufeng. Microgrid black-start considering DG startup sequence and load restoration optimization[J]. Electric Power Automation Equipment, 2016, 36(3): 46-52 [19] SUN W, LIU C C, ZHANG L. Optimal generator start-up strategy for bulk power system restoration[J]. IEEE Transactions on Power Systems, 2011, 26(3): 1357-1366. [20] 吴文传, 张伯明, 巨云涛. 主动配电网网络分析与运行调控 [M]. 北京: 科学出版社, 2016: 192–200. |