[1] 肖宏伟. 2018年电力形势分析与2019年展望[J]. 中国物价, 2019, 2(358): 13–16 XIAO Hongwei. Power situation analysis in 2018 and prospect in 2019[J]. China Price, 2019, 2(358): 13–16 [2] 李新, 容冰, 穆献中, 等. 生态环保推动火电行业高质量发展的路径机制及改进对策[J]. 环境保护, 2019, 47(2): 59–63 LI Xin, RONG Bing, MU Xianzhong, et al. The mechanism and improving measure of ecological environmental protection to promote high-quality development of thermal power industry[J]. Environmental Protection, 2019, 47(2): 59–63 [3] 周斌, 崔雪, 邹晨露, 等. 基于合作博弈的风水火联合运营研究[J]. 电测与仪表, 2019, 56(6): 69–75 ZHOU Bin, CUI Xue, ZOU Chenlu, et al. Research on wind-hydro-thermal power joint operation based on cooperative game theory[J]. Electrical Measurement & Instrumentation, 2019, 56(6): 69–75 [4] 黄小军. 600 MW汽轮机的优化启动[J]. 华电技术, 2016, 38(7): 20–24 HUANG Xiaojun. Optimal start up on 600 MW steam turbine[J]. Huadian Technology, 2016, 38(7): 20–24 [5] 郑文广, 司顺勇, 朱良松, 等. 1 000 MW机组启停节油技术研究[J]. 中国电力, 2014, 47(4): 38–43 ZHENG Wenguang, SI Shunyong, ZHU Liangsong, et al. Study on oil-saving technology in startup and shutdown of 1 000 MW units[J]. Electric Power, 2014, 47(4): 38–43 [6] 丁勇富. 配CFB锅炉的300 MW机组汽轮机暖机效果探讨[J]. 热力发电, 2010, 39(3): 78–81 DING Yongfu. An approach to warm-up effectiveness of steam turbine equipped for 300 MW CFB unit[J]. Thermal Power Generation, 2010, 39(3): 78–81 [7] 查文建. 联合循环机组凝汽器压力对汽轮机冷态启动暖机时间的影响[J]. 浙江电力, 2015, 34(5): 49–52 ZHA Wenjian. Influence of combined cycle units condenser pressure on warming-up time of turbine cold-state startup[J]. Zhejiang Electric Power, 2015, 34(5): 49–52 [8] 宗绪东, 孙奉仲. 配汽机构对汽轮机组经济性的影响及优化研究[J]. 汽轮机技术, 2015, 57(6): 475–477 ZONG Xudong SUN Fengzhong. Steam distribution device effect and optimization on the economy of steam turbo unit[J]. Turbine Technology, 2015, 57(6): 475–477 [9] 刘新龙, 巨林仓, 胡平. DEH阀门流量特性曲线校正[J]. 汽轮机技术, 2011, 53(4): 288–290 LIU Xinlong, JU Lincang, HU Ping. Adjustment for the flow characteristic curve of DEH valves[J]. Turbine Technology, 2011, 53(4): 288–290 [10] 万祥, 胡念苏, 韩鹏飞, 等. 大数据挖掘技术应用于汽轮机组运行性能优化的研究[J]. 中国电机工程学报, 2016, 36(2): 459–467 WAN Xiang, HU Niansu, HAN Pengfei, et al. Research on application of big data mining technology in performance optimization of steam turbines[J]. Proceedings of the CSEE, 2016, 36(2): 459–467 [11] 张春发, 王惠杰, 宋之平, 等. 火电厂单元机组最优运行初压的定量研究[J]. 中国电机工程学报, 2006, 26(4): 36–40 ZHANG Chunfa, WANG Huijie, SONG Zhiping, et al. Quantitative research of optimal initial operation pressure for the coal-fired power unit plant[J]. Proceedings of the CSEE, 2006, 26(4): 36–40 [12] 潘阳, 袁奇, 朱光宇. 进汽结构对部分进汽损失的影响研究[J]. 中国电机工程学报, 2018, 38(14): 4156–4164, 4321 PAN Yang, YUAN Qi, ZHU Guangyu. Numerical investigation on the influence of inlet structure on partial-admission losses[J]. Proceedings of the CSEE, 2018, 38(14): 4156–4164, 4321 [13] 张锐锋, 吴鹏, 柏毅辉, 等. 基于历史数据挖掘的汽轮机阀门管理曲线优化[J]. 电站系统工程, 2018, 34(5): 49–52 ZHANG Ruifeng, WU Peng, BAI Yihui, et al. Optimization for management curves of turbine valves based on historical data mining[J]. Power System Engineering, 2018, 34(5): 49–52 [14] 黄勇, 陈源培. DEH压力限制对超超临界机组甩负荷的影响[J]. 热力透平, 2012, 41(4): 303–306 HUANG Yong, CHEN Yuanpei. Effect of DEH main steam pressure limitation on load rejection of USC steam turbine unit[J]. Thermal Turbine, 2012, 41(4): 303–306 [15] 阚伟民, 蔡笋, 谢诞梅, 等. 超超临界1 000 MW机组甩负荷试验研究[J]. 热力发电, 2011, 40(5): 73–76, 80 KAN Weimin, CAI Sun, XIE Danmei, et al. Study on load rejection test of ultra-supercritical 1 000 MW unit[J]. Thermal Power Generation, 2011, 40(5): 73–76, 80 [16] 王异成, 张宝, 丁阳俊, 等. 660 MW机组甩负荷试验时转速飞升过高原因分析[J]. 浙江电力, 2015, 34(9): 46–49 WANG Yicheng, ZHANG Bao, DING Yangjun, et al. Cause analysis on high rotation speed rising of 660 MW units in load shedding test[J]. Zhejiang Electric Power, 2015, 34(9): 46–49 [17] 王家胜, 赵杰, 钟晶亮, 等. 超临界机组甩负荷试验超速原因分析及处理[J]. 热力发电, 2018, 47(8): 115–119 WANG Jiasheng, ZHAO Jie, ZHONG Jingliang, et al. Reason analysis and treatment for over-speed of load rejection test of supercritical units[J]. Thermal Power Generation, 2018, 47(8): 115–119 [18] 郭亚楠, 谢诞梅, 梅子岳, 等. CPR1000核电汽轮机高压缸甩负荷工况热应力及变形分析[J]. 热能动力工程, 2019, 34(2): 31–38 GUO Yanan, XIE Danmei, MEI Ziyue, et al. Thermal stress and deformation of high pressure casing of CPR1000 nuclear steam turbine in the load rejection condition[J]. Journal of Engineering for Thermal Energy and Power, 2019, 34(2): 31–38 [19] 徐章福, 邓彤天, 钟晶亮, 等. 一种用于汽轮发电机组甩负荷后快速稳定转速的方法: CN106958465A[P]. 2017-07-18. [20] 徐章福, 邓彤天, 钟晶亮, 等. 一种适用于高中压联合启动汽轮发电机组的暖机方法: CN106948890A[P]. 2017-07-14.
|