[1] 肖白,杨林,穆钢,等. 大规模风电集中接入的输电网扩展规划平台研发[J]. 中国电力,2015,48(2):117-121. XIAO Bai, YANG Lin, MU Gang, et al . Research and development of transmission network expansion planning platform with centralized integration of large scale wind power [J]. Electric Power, 2015, 48(2): 117-121. [2] 李文佩,方华亮,马溪源,等. 短时需求响应对含风电电源规划的影响研究[J]. 中国电力,2015,48(2):122-127. LI Wenpei, FANG Hualiang, MA Xiyuan, et al . Study on the impacts of short-term demand response on generation expansion planning with wind power[J]. Electric Power, 2015, 48(2): 122-127. [3] 谷峰,曹优乐图. 风电场接入电力系统最佳接入点选择[J]. 电网与清洁源,2010,26(3):73-76. GU Feng, CAO Youletu. Choice of best access point for connecting wind farms to power systems[J]. Advances of Power System & Hydro Electric Engineering, 2010, 26(3): 73-76. [4] 马幼捷,杨海珊,周雪松,等. 风电系统的电压稳定性分析[J].电力系统及其自动化学报,2010,22(2):22-26. MA Youjie, YANG Haishan, ZHOU Xuesong, et al . Voltage stability analysis of wind power system[J]. Proceedings of the CSU-EPSA, 2010, 22(2): 22-26. [5] 姚刚,彭志炜,袁旭峰,等. 基于 U - Q 灵敏度法的风电接入研究[J]. 电测与仪表,2012,49(3):36-41. YAO Gang, PENG Zhiwei, YUAN Xufeng, et al . Research of windpower integration based on U - Q sensitivity method[J].Electrical Measurement & Instrumentation, 2012, 49(3): 36-41. [6] 孙惠娟,彭春华,廖成. 基于Power World的电网稳定性可视化分析[J]. 华东交通大学学报,2010,27(4):57-62. SUN Huijuan, PENG Chunhua, LIAO Cheng. Visualization analysis of power system stability based on power world [J]. Journal of East China Jiaotong University, 2010, 27(4): 57-62. [7] 何宇,姚刚,殷旭升. 风力发电机组运行特性分析研究[J]. 贵州电力技术,2012,15(3):15-17. HE Yu, YAO Gang, YIN Xusheng. Study on operating characteristic analysis of wind turbine[J]. Guizhou Electric Power Technology, 2012, 15(3): 15-17. [8] 李世双,姚刚,殷旭升,等. 基于电压稳定性的风电接入研究[J]. 河南电力,2014,15(1):10-14. LI Shishuang, YAO Gang, YIN Xusheng, et al . Research of the windpower integration based on voltage stability[J]. Henan Electric Power, 2014, 15(1): 10-14. [9] 刘婷,卢海,王玲,等. 计及风电接入的电力系统电压稳定薄弱区域研究[J]. 广东电力,2013, 26(11):14-19. LIU Ting, LU Hai, WANG Ling, et al . Study on voltage stability weak area of power system taking into account wind power connnection [J]. Guangdong Electric Power, 2013, 26(11): 14-19. |