[1] 薛禹胜. 综合防御由偶然故障演化为电力灾难——北美“8·14”大停电的警示[J]. 电力系统自动化,2003,27(18):1-5,37. XUE Yusheng. The way from a simple contingency to system wide disaster: lesson from the eastern interconnection blackout in 2003[J]. Automation of Electric Power Systems, 2003, 27(18): 1-5,37. [2] ANDERSSON G, DONALEK P, FARMER R, et al. Causes of the 2003 major grid blackouts in North America and Europe, and recommended means to improve system dynamic performance[J].IEEE Transactions on Power Systems, 2005, 20(4): 1922-1928. [3] 阮前途,马若新,肖飞,等. 菲律宾吕宋电网系统崩溃及黑启动措施分析[J]. 电力系统自动化,2011,35(4):82-91. RUAN Qiantu, MA Ruoxin, XIAO Fei, et al. Blackout and restoration experience in Luzon grid[J]. Automation of Electric Power Systems, 2011, 35(4): 82-91. [4] LESTR H F, LION K L, LIU C C. From generic restoration to specific restoration strategies[J]. IEEE Transactions on Power Systems, 1995, 10(2): 745-752. [5] JERRY J A. A framework for power system restoration following a major power failure[J]. IEEE Transactions on Power Systems,1995, 9(3): 1480-1485. [6] 刘崇茹,邓应松,卢恩,等. 大停电后发电机启动顺序优化方法[J]. 电力系统自动化,2013,37(18):55-59. LIU Chongru, DENG Yingsong, LU En, et al. Optimization of generator star-up sequence in power system restoration[J].Automation of Electric Power Systems, 2013, 37(18): 55-59. [7] 朱冬雪,顾雪平,钟慧荣. 电力系统大停电后机组恢复的多目标优化方法[J]. 电网技术,2013,37(3):814-820. ZHU Dongxue, GU Xueping, ZHONG Huirong. A multi-objective optimization method for post-blackout unit restoration[J]. Power System Technology, 2013, 37(3): 814-820. [8] 刘强,石立宝,周明,等. 电力系统恢复中机组恢复的优化选择方法[J]. 电工技术学报,2009,24(3):164-170. LIU Qiang, SHI Libao, ZHOU Ming, et al. Optimal strategy for units start-up during power system restoration[J]. Transactions of China Electrotechnical Society, 2009, 24(3): 164-170. [9] 梁海平,顾雪平. 基于节点恢复可靠性的骨架网络重构[J]. 华北电力大学学报,2014,41(4):30-34,40. LIANG Haiping, GU Xueping. Skeleton-network reconfiguration based on node restoration reliability[J]. Journal of North China Electric Power University, 2014, 41(4): 30-34, 40. [10] 沙峰,杨建彪,艾欣,等. 基于改进数据包络分析模型的黑启动方案评估[J]. 中国电力,2013,46(2):50-54. SHA Feng, YANG Jianbiao, AI Xin, et al. Assessment of black start plans based on improved data envelopment analysis model[J]. Electric Power, 2013, 46(2): 50-54. [11] 区伟健,房鑫炎,胡子珩,等. 基于粗糙熵理论的孤网黑启动方案评估[J]. 中国电力,2014,47(5):11-16. OU Weijian, FANG Xinyan, HU Ziheng, et al. Black-start plan assessment for power systems with isolated based on rough entropy [J]. Electric Power, 2014, 47(5): 11-16. [12] 周敏,刘艳. 计及火电机组启动过程的网架并行恢复策略[J].电力系统自动化,2011,35(10):30-34,93. ZHOU Min, LIU Yan. A parallel restoration strategy for power network considering the start-up process of thermal units[J].Automation of Electric Power Systems, 2011, 35(10): 30-34, 93. [13] 顾雪平,钟慧荣,贾京华,等. 电力系统扩展黑启动方案的研究[J]. 中国电机工程学报,2011,31(28):25-32. GU Xueping, ZHONG Huirong, JIA Jinghua, et al. Extended black-start schemes of power systems[J]. Proceedings of the CSEE, 2011, 31(28): 25-32. [14] 陈亮,顾雪平,贾京华. 考虑后续恢复影响的扩展黑启动方案多目标优化与决策[J]. 电力自动化设备,2014,34(2):137-143, 150. CHEN Liang, GU Xueping, JIA Jinghua. Multi-objective optimization and decision making of extended black-start scheme considering subsequent restoration influence[J]. Electric Power Automation Equipment, 2014, 34(2): 137-143, 150. [15] 刘艳,刘国良,顾雪平. 输电网架恢复方案线路投运风险评估[J]. 电力系统自动化,2011,35(13):12-16. LIU Yan, LIU Guoliang, GU Xueping. Line risk assessment in transmission network restoraion schemes[J]. Automation of Electric Power Systems, 2011, 35(13): 12-16. [16] 刘翔宇,梁海平,张凡. 基于负荷恢复的后续网络恢复方法研究[J]. 华北电力大学学报,2011,38(4):33-38. LIU Xiangyu, LIANG Haiping, ZHANG Fan. Algorithm research of transmission line restoration based on load restoration during subsequent process of black start[J]. Journal of North China Electric Power University, 2011, 38(4): 33-38. |