中国电力 ›› 2015, Vol. 48 ›› Issue (12): 122-128.DOI: 10.11930/j.issn.1004-9649.2015.12.122.6

• 电网 • 上一篇    下一篇

基于在线分布负荷预测的智能AGC主动协调控制系统

石辉   

  1. 国网湖南省电力公司电力调度控制中心,湖南 长沙 410007
  • 收稿日期:2015-09-03 出版日期:2015-12-18 发布日期:2015-12-30
  • 作者简介:石辉(1986—),男,湖北孝感人,工学硕士,工程师,从事电力调度运行与分析工作。E-mail: 357970809@qq.com

Study on the Intelligent AGC Initiative Coordinated Control System Based on the Online Prediction of Distributed Power Load

SHI Hui   

  1. Hunan Electric Power Dispatch & Control Center of SGCC, Changsha 410007, China
  • Received:2015-09-03 Online:2015-12-18 Published:2015-12-30

摘要: 针对传统AGC实时调度面向特高压智能电网存在的不足,立足于D5000一体化数据平台,提出一种由多模块组合的智能AGC主动协调控制系统。主程序模块通过全网分布负荷超短期同步预测,自动进行AGC可调判断、开/停机筛选、实时出力调节;辅助模块嵌套执行操作前预调节、事故后紧急调节任务。该系统能根据负荷变化自动优选并远程开/停水电机组,自动优化控制全网机组出力,协助调度员自动进行设备停电前的预调节及事故跳闸后紧急调节。仿真算例表明,该系统能有效提高最优日前发电计划的执行率并优化运行指标,促进电网进行趋稳调节,减轻调度员劳动强度。

关键词: 超短期, 智能AGC, 实时调节, 预调节, 紧急调节

Abstract: Based on the D5000 integrated data platform, an intelligent AGC initiative coordinated control system is proposed, which is composed of multi-modules. The main program module can, through ultra short-term synchronized forecasting of the distributed load, carry out several functions automatically, including AGC adjustable judgment, start/stop unit screening, real-time output adjustment. The auxiliary module can proceed the pre-conditionings before switching and emergency adjustment after accidents. The intelligent AGC system can automatically optimize and remotely start/stop hydropower units according to the load fluctuation, and automatically optimize the unit output of the whole grid. Besides, the AGC system can assist the dispatchers to perform pre-conditions before the equipment blackout and emergency adjustment after accident trip. The simulation case shows that the system can not only effectively improve the implementation rate of optimal short-term generation scheme and optimize the performance indicators, but also assist the power grid stabilization adjustment and reduce the labor intensity of dispatchers.

Key words: ultra short-term, intelligent AGC, real-time adjustment, pre-conditioning, emergency adjustment

中图分类号: