[1] 孙竹森,程永锋,张强,等. 输电线路钢管塔的推广与应用[J]. 电网技术,2010,34(6):186-192. SUN Zhu-sen, CHENG Yong-feng, ZHANG Qiang, et al . Application and dissemination of steel tubular tower in transmission lines [J]. Power System Technology, 2010, 34(6): 186-192. [2] 杨靖波,李茂华,杨风利,等. 我国输电线路杆塔结构研究新进展[J]. 电网技术,2008,32(22):77-83. YANG Jing-bo, LI Mao-hua, YANG Feng-li, et al . New advances in the study of transmission tower structure of China[J]. Power System Technology, 2008, 32(22): 77-83. [3] 侯景鹏,陈加宝,雷俊方. 输电塔线体系非线性地震反应分析[J]. 中国电力,2012,45(11):65-69. HOU Jing-peng, CHEN Jia-bao, LEI Jun-fang. Nonlinear dynamic response analysis of the transmission tower-line system under earthquake [J]. Electric Power, 2012, 45(11): 65-69. [4] 金逸,肖匀,刘庭,等. 500 kV同塔四回线路不全停运检修作业方式研究[J]. 中国电力,2012,45(9):29-34. JIN Yi, XIAO Yun, LIU Ting, et al . Study on circuit service without total outage of the 500 kV transmission line of four circuits on one tower [J]. Electric Power, 2012, 45(9): 29-34. [5] 倪阳.浅析应用于钢管塔中的日式高颈锻造法兰[J].华东电力, 2009,37(8):1259-1264. NI Yang. Analysis of Japanese style welding neck flange on steel pipe tower [J]. East China Electric Power, 2009, 37(8): 1259-1264. [6] 李清华,杨靖波,韩军科,等. 超/特高压交流同塔四回钢管塔设计及试验[J]. 中国电力,2012,45(3):14-17. LI Qing-hua, YANG Jing-bo, HAN Jun-ke, et al . Design and full- scale test for steel tubular tower of UHV and EHV quadruple- circuit transmission line on the same tower[J]. Electric Power,2012, 45(3): 14-17. [7] 高雁,杨靖波,韩军科.超-特高压多回杆塔结构可靠性分析[J]. 电网技术,2010,34(9):181-184. GAO Yan, YANG Jing-bo, HAN Jun-ke. Analysis on structural reliability of multi-circuit tower for EHV and UHV AC power transmission line[J]. Power System Technology, 2010, 34(9): 181-184. [8] 夏开全,李茂华,李峰. 特高压输电线路直线塔结构分析与试验[J]. 高电压技术,2007,33(11):56-60. XIA Kai-quan, LI Mao-hua, LI Feng. Structural analysis and testing research for Chinese 1 000 kV UHV AC transmission tower [J]. High Voltage Engineering, 2007, 33(11): 56-60. [9] 李茂华,董建尧,杨靖波,等.特高压双回路钢管塔真型试验[J].中国电机工程学报,2009,29(34):102-107. LI Mao-hua, DONG Jian-yao, YANG Jing-bo, et al . Full-scale test for tubular steel tower applied in UHV AC double-circuit transmission line[J]. Proceedings of the CSEE, 2009, 29(34): 102-107. [10] 黄璜,李清华,孟宪乔. Q420大规格角钢在±800 kV特高压杆塔中的应用[J]. 电力建设,2010,31(6): 65-69. HUANG Huang, LI Qing-hua, MENG Xian-qiao. Application on Q420 large width angle steel in ±800 kV UHV transmission tower [J]. Electric Power Construction, 2010, 31(6): 65-69. [11] 中国电力科学研究院. 双回1 000 kV、单回±800 kV与双回500 kV、220 kV交流同塔多回输电线路杆塔材料及结构研究[R]. 2011. [12] 吴国强,何长华. 钢管塔锻造法兰连接螺栓的受力计算[J]. 电力建设,2009,30(10):1-5. WU Guo-qiang, HE Chang-hua. Research on bolt calculation in forging flanges used in steel tube tower[J]. Electric Power Construction, 2009, 30(10): 1-5. [13] 国家能源局. DL/T 5442—2010 输电线路铁塔制图和构造规定[S]. 2010. [14] 赵建国,牛林. 日本特高压交流输电技术的研究与实践[J]. 电力系统及其自动化学报,2007,19(4):1-6. ZHAO Jian-guo, NIU Lin. Research and application of UHV AC transmission technologies in Japan[J]. Proceedings of the CSU- EPSA, 2007, 19(4): 1-6. [15] 龚泉,肖立群. 新型钢管塔的设计与应用研究 [J].华东电力,2009, 37(8):1265-1269. GONG Quan, XIAO Li-qun. Review of the design and application of new steel-pipe tower [J]. East China Electric Power 2009, 37(8): 1265-1269. [16] DL/T 5254—2010 架空输电线路钢管塔设计技术规定[S]. [17] 常建伟,徐德录,张东英,等. 我国输电线路钢管塔制造技术现状综述[J]. 钢结构,2011,26(8):46-50. CHANG Jian-wei, XU De-lu, ZHANG Dong-ying, et al . A review of manufacturing technology of transmission line steel tubular tower in China [J]. Steel Construction, 2011, 26(8): 46-50. |