[1] 朱光明,段学农,姚斌,等.典型贫煤与无烟煤混煤配比优化实验[J].中国电力,2011,44(8):32-35. ZHU Guang-ming, DUAN Xue-nong, YAO Bin, et al . Optimization test of blending radio between typical lean coal and anthracite[J].Electric Power,2011,44(8):32-35. [2] 陈刚,夏季,彭鹏,等.火电机组混煤掺烧全程动态优化系统开发与应用[J].中国电力,2011,44(4):50-54. CHEN Gang, XIA Ji, PENG Peng, et al . Dynamic optimization system of entire process for coal blending in thermal power plant[J].Electric Power,2011,44(4):50-54. [3] 王祝成.电厂锅炉掺烧褐煤和印尼煤的经济性分析[J].能源技术经济,2012,24(2):28-32. WANG Zhu-cheng. Economic analysis of blending lignitous coal and Indonesia coal for the power plant boiler[J]. Energy Technology and Economics,2012,24(2):28-32. [4] 卢广宇.燃用混煤大型锅炉优化运动技术及应用[J].中国电力,2010,43(12):56-59. LU Guang-yu. Optimization operation technology and its application of large blending coal-fired boiler[J]. Electric Power,2010,43(12):56-59. [5] 郭鲁阳,季明斌,王富文,等.600 MW超临界锅炉混煤燃烧试验研究[J].华电技术,2011,33(11):12-14. GUO Lu-yang, JI Ming-bin, WANG Fu-wen, et al . Experimental research on blended coal combustion for 600 MW supercritical boiler[J]. Huadian Technology,2011,33(11):12-14. [6] 段学农,朱光明,宾谊沅,等.湖南省电厂锅炉混煤掺烧技术应用[J].中国电力,2010,43(2):48-51. DUAN Xue-nong, ZHU Guang-ming, BIN Yi-yuan, et al . Application and development of coal-blended combustion technology in boiler in Hunan power plant[J].Electric Power,2010,43(2):48-51. [7] 陈立志.火力发电厂大比例掺烧褐煤方案分析[J]. 华电技术, 2011, 33(6):11-12. CHEN Li-zhi. Analysis on large ratio lignite blended burning scheme in thermal power plant[J]. Huadian Technology, 2011, 33(6):11-12. [8] 王建强,郑渭建.600 MW锅炉汽温多变量模型预测控制[J].中国电力,2011,44(10):60-63. WANG Jian-qiang, ZHENG Wei-jian. Multi-variable model predictive control of steam temperature in 600 MW boiler[J]. Electric Power, 2011,44(10):60-63. [9] 陈一平,于鹏峰,朱光明,等.600 MW“W”型火焰锅炉大屏过热器超温及技术改造[J].中国电力,2011,44(5):52-55. CHEN Yi-ping, YU Peng-feng, ZHU Guang-ming, et al . Retrofit of platen superheater for over-temperature in 600 MW “W” flame boiler[J]. Electric Power,2011,44(5):52-55. |