[1] 张炳建,徐杰彦,宋杰,等. 中国电力需求响应的发展动因与实施手段[J]. 电力需求侧管理,2013,15(4):1-5. ZHANG Bingjian, XU Jieyan, SONG Jie, et al. The development of China’s electric power demand response and implementation method [J]. Power DSM, 2013, 15(4): 1-5. [2] 潘璠,贾文昭,许柏婷,等. 广东电网需求侧响应潜力分析[J].中国电力,2011,44(12):21-25. PAN Fan, JIA Wenzhao, XU Baiting, et al. Analysis on demand- side response potential of Guangdong power grid[J]. Electric Power, 2011, 44(12): 21-25. [3] 张钦. 智能电网下需求响应热点问题探讨[J]. 中国电力,2013,46(6):85-90. ZHANG Qin. Exploration of hot issues on demand response in smart grids [J]. Electric Power, 2013, 46(6): 85-90. [4] 刘新东,陈焕远,方科. 利用负荷需求响应提高大规模风电并网能力[J]. 中国电力,2012,45(4):9-12. LIU Xindong, CHEN Huanyuan, FANG Ke. Research on demand response for wind power integration into smart grid[J]. Electric Power, 2012, 45(4): 9-12. [5] 胡江溢,王鹤,周昭茂. 电力需求侧管理的国际经验及对我国的启示[J]. 电网技术,2007,31(18):10-14. HU Jiangyi, WANG He, ZHOU Zhaomao. International experience of power demand side management and enlightenment to China [J]. Power System Technology, 2007, 31(18): 10-14. [6] GELLINGS C W, WILLIAM M. Smith. Integrating demand-side management into utility planning[J]. Proceedings of the IEEE, 1989, 77(6): 908-918. [7] 付万明,宋晓辉. DSM对配电网规划的影响[J]. 广东电力, 2006,19(9):22-26. FU Wanming, SONG Xiaohui. Influence of demand side management on distribution network planning[J]. Guangdong Electric Power, 2006, 19(9): 22-26. [8] 吉兴全,王成山. 计入需求弹性的输电网动态规划方法[J]. 中国电机工程学报,2002,22(11):23-27. JI Xingquan, WANG Chengshan. Transmission dynamic expansion considering demand elasticity [J]. Proceedings of the CSEE, 2002, 22(11): 23-27. [9] 储琳琳,张亮,倪群辉,等. 当前电力体制下考虑需求侧管理的电网规划新思路[J]. 电力需求侧管理,2010,12(5):9-13,18. CHU Linlin, ZHANG Liang, NI Qunhui, et al. New thoughts about network planning considering DSM based on current power system [J]. Power DSM, 2010, 12(5): 9-13, 18. [10] LAT0RRE G, CRUZ R D, AREIZA J M, et al. Classification of publications and models on transmission expansion planning [J]. IEEE Transactions on Power Systems, 2003, 18(2): 938-946. [11] 盛晓萍, 刘严. 电力需求侧管理投入补偿机制研究[J]. 中国电力,2007,40(12):18-22. SHENG Xiaoping, LIU Yan. Study on compensation mechanism of DSM investment [J]. Electric Power, 2007, 40(12): 18-22. [12] ROMERO R, MONTICELLI A, GARCIA A, et al. Test systems and mathematical models for transmission network expansion planning[J]. IEE Proc., Gener. Transm. Distrib., 2002, 149(1): 27-36. |