Electric Power ›› 2017, Vol. 50 ›› Issue (6): 108-112.DOI: 10.11930/j.issn.1004-9649.2017.06.108.05

• Power System • Previous Articles     Next Articles

Manufacture and Application of the Fully-Enclosed Self-Assembly Building for UHV GIS Installation

LIU Jiannan1, TIAN Wenmin2, ZHANG Guoqiang3, YAN Guozeng1, NI Xiangping1, BIAN Xiujie1   

  1. 1. State Grid AC Engineering Construction Company, Beijing 100052, China;
    2. Beijing Electric Power Transmission and Transformation Company, Beijing 102401, China;
    3. East China Power Transmission and Transformation Engineering Company, Shanghai 201803, China
  • Received:2017-01-25 Online:2017-06-20 Published:2017-07-12
  • Supported by:
    ; This work is supported by the Science and Technology of SGCC Project (No. SGZJ0000JJJS1400634).

Abstract: The fully-enclosed self-assembly building is a new sort of facility for outdoor UHV GIS installation, which creates a fully enclosed environment and overcomes the adverse influence of external environment. Hence it can ensure high quality of GIS installation, improve the installation efficiency, and provide good working environment. This paper mainly introduces the development background, basic structure, application mode, engineering application state and social economic benefits of the self-assembly building, which have been successfully used in Anhui-East project and Zhebei-Fuzhou project. Seeing its excellent application outcome, we have decided to popularize the installation of self-assembly building in all the subsequent UHV AC projects in China.

Key words: UHV GIS, 1 000 kV GIS installation, totally-enclosed building, self-assembly building, indoor installation, industrial installation

CLC Number: