Electric Power ›› 2016, Vol. 49 ›› Issue (8): 110-115.DOI: 10.11930/j.issn.1004-9649.2016.08.110.06

• Technology and Economics • Previous Articles     Next Articles

Comprehensive Self-Determined Evaluation of Electric Power Development Level Based on IOWA Operator

KANG Yi1, ZHOU Yifan2, BING Huanshuai1, HU Wei2, GUO Jian3   

  1. 1. Central Southern China Electric Power Design Institute CO., LTD. of China Power Engineering Consulting Group, Wuhan 430071, China;
    2. Power Systems State Key Lab, Dept. of Electrical Engineering, Tsinghua University, Beijing 100084, China;
    3. College of Electrical Engineering & New Energy, Three Gorges University, Yichang 443002, China
  • Received:2016-03-20 Online:2016-08-10 Published:2016-08-12
  • Contact: This work is supported by Science and Technology Project of the CPECC (No. DG1-X08-2014).

Abstract: A comprehensive evaluation method of electric power development level is proposed in this paper based on objective self-determined evaluation. The evaluation index system contains 6 second-order indexes and 31 third-order indexes. The general and complete index system can provide a comprehensive description of the electric power development level from multiple perspectives. An IOWA operator-based objective self-determined evaluation method is used to establish a linear weighted model for evaluation of the electric power development level. Furthermore, a case study is conducted to make a comprehensive evaluation of the electric power development level in typical provinces in China, which has proved the validity of the proposed index system and evaluation method.

Key words: order indexes, power system development level, self-determined evaluation, IOWA operator

CLC Number: