[1] 贾建忠. 2×300 MW机组石灰石-石膏湿法烟气脱硫(FGD)系统的运行维护[J]. 内蒙古科技与经济,2008,6(3):242-246.JIA Jian-zhong. 2×300 MW units of limestone-gypsum wet flue gas desulfurization(FGD) system operation and maintenance [J]. Inner Mongolia Science Technology and Economy, 2008,6(3): 242-246. [2] 曾庭华,廖永进,马斌. 连州电厂湿法烟气脱硫石膏脱水与排放系统的设计和运行分析[J].电力环境保护,2003,19(2):13-16.ZENG Ting-hua, LIAO Yong-jin, MA Bin. Design and operation of the gypsum dewatering and disposing system in FGD of Lianzhou power plant [J]. Electric Power Environmental Protection, 2003,19(2):13-16. [3] 李守信,胡玉亭,纪立国.湿式石灰石-石膏法烟气脱硫中石膏质量的工艺控制因素[J]. 电力环境保护,2002,18(3):5-7.LI Shou-xin, HU Yu-ting, JI Li-guo. The factors controlling gypsum quality in wet limestone(lime)-gypsum flue gas desulfurization[J]. Electric Power Environmental Protection, 2002,18(3): 5-7. [4] 张朝平. 水平真空皮带过滤设备及其在湿式烟气脱硫工艺中的应用[J]. 电力环境保护,2004,20(2):17-18.ZHANG Zhao-ping. Horizontal vacuum belt filter-important equipment in wet limestone-gypsum FGD[J]. Electric Power Environmental Protection, 2004, 20(2): 17-18. [5] 邓辉鹏,沈煜晖. 西塞山电厂烟气脱硫技术改造工程石膏脱水系统分析[J]. 华电技术, 2010,32(6):72-75.DENG Hui-peng, SHEN Yu-hui. Analysis for the gypsum dewatering system of flue gas desulphurization technical refor- mation project in Xisaishan power plant[J]. Huadian Technology, 2010, 32(6): 72-75. [6] 沈建军,武丽英,祁利明. 火电厂湿法烟气脱硫石膏脱水问题分析及处理措施[J]. 工业安全与环保, 2010,36(11):26-28.SHEN Jian-jun, WU Li-ying, QI Li-ming. Analysis on gypsum dehydration in wet flue gas desulfurization of power plant [J]. Industrial Safety and Environmental Protection, 2010, 36(11): 26-28. [7] 邱振波. 宁海电厂FGD石膏脱水系统存在问题及其技术对策[J]. 电力科学与工程, 2010,26(1):63-65.QIU Zhen-bo. Problem and technical countermeasures of FGD plaster dehydrating system in Ninghai power plant[J]. Electric Power Science and Engineering, 2010, 26(1): 63-65. |