Real-Time Path Planning for Power Tower Inspection Based on Hybrid Algorithm

HUANG Zheng1, WANG Hongxing1, ZHOU Hang2, ZHANG Xingwei1, ZHAO Hongwei2   

  1. 1. Jiangsu Frontier Electric Technology Co., Ltd., Nanjing 211102, China;
    2. College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 211106, China
  • Received:2020-03-27 Revised:2020-12-08 Online:2021-11-05 Published:2021-11-16
  • Supported by:
    This work is supported by Science and Technology Project of Jiangsu Frontier Electric Technology Co., Ltd. (No.KJ201915)

Abstract: The sequence of conventional shooting viewpoints for power tower is fixed and the inspection distance of multi-rotor UAV is not optimal. In addition, as the dimension increases, the path planning algorithm cannot meet the requirements of real-time path planning because the space complexity increases exponentially. Aiming at those problems, a three-dimensional path planning method for power tower inspection is proposed based on ant colony optimization and A * (ACO-A*) hybrid algorithm. The method is composed of global planning and local planning. Firstly, the global planning uses the ant colony optimization algorithm to find a relatively optimal path that covers all viewpoints, and to judge whether the path passes through obstacles. And then the A* algorithm is used for local planning. The simulation results show that the path length planned by the proposed ACO-A* algorithm is reduced by 16.68% compared to that stipulated in the Shooting Manual for UAV Inspection Images of Overhead Transmission Lines, and the path planning time is reduced by 99.68% compared to that of the A* algorithm. Therefore, the proposed method not only reduces the energy consumption for inspection, but also enhances the efficiency of path planning.

Key words: three-dimensional path planning, ant colony algorithm, A* algorithm, hybrid algorithm, power tower inspection