Electric Power ›› 2018, Vol. 51 ›› Issue (3): 100-104.DOI: 10.11930/j.issn.1004-9649.201704045

Previous Articles     Next Articles

Research on Development Prospect of Wind Power in Eastern and Central China

XIE Guohui1, HE Yongsheng2, WANG Qingran3   

  1. 1. State Grid Energy Research Institute Co., Ltd., Beijing 102209, China;
    2. State Grid Corporation of China, Beijing 100031, China;
    3. State Grid Xinyuan Company Ltd., Beijing 100761, China
  • Received:2017-04-12 Revised:2017-09-08 Online:2018-03-05 Published:2018-03-12
  • Supported by:
    This work is supported by Science and Technology Project of SGCC (No.SGTYHT/15-JS-191).

Abstract: Wind power development in Eastern and Central Region became new hot spots with layout optimization in order to reduce curtailment during the Thirteen five period. Current status of wind power deployment in 12 provinces are described. Main impact factors on wind power development are analyzed from aspects of wind resources distribution, low-speed wind turbine application and developing cost. Wind power development prospects are discussed. During the Thirteen five period, wind power in Eastern and Central Region will accelerate rapidly driven by polices. After that, wind power deploying scale limit will be reached due to resource constrain. Further supporting tariff policy are needed to compensate development cost.

Key words: layout optimization, eastern and central region, wind resource, low-speed wind turbine, developing cost

CLC Number: