Research on Regional Electric Power Integrated Resource Strategic Planning under New Situation of Henan Province

BAI Hongkun1, WANG Jiangbo1, YIN Shuo1, ZHENG Yanan2, LIU Yongmin1, LI Hujun1   

  1. 1. State Grid Henan Economic and Technological Research Institute, Zhengzhou 450052, China;
    2. Energy Resarch Institute National Development and Reform Commission, Beijing 100038, China
  • Received:2016-12-23 Online:2017-03-20 Published:2017-03-17

Abstract: In the face of increasingly strained resources and environment, and against the geographic, resources and demand characteristics of Henan province, and through construction of power constraints of transregion grid transmission lines in six areas of Henan province, a Henan province integrated resource strategic planning model (HNIRSP) considering transregion power trasmission is established to study the regional resources overall optimization path of Henan province. The scenario analysis of HNIRSP shows that after removing the efficiency power plants(EPP), the needed installed capcacity of Henan province during 2014-2030 will reach 96 950 MW, deacreasing 32 250 MW compared with the balanced results, consequently reducing the whole social investment of 10.86 billion yuan, and reducing the emissions of CO2, SO2 and nitrogen oxides by 116.27 million tons, 377 000 tons and 328 000 tons, respectively.

Key words: integrated resource strategic planning, electricity power layout, demand side management, efficiency power plant