中国电力 ›› 2014, Vol. 47 ›› Issue (6): 26-30.DOI: 10.11930/j.issn.1004-9649.2014.6.26.4

• 电网 • 上一篇    下一篇

烟台220 kV沈福线与嵛新线开断改接规划设计

王茂成1, 2, 康凯2, 李刚2, 刘树华1, 2, 王星涵3, 梁屿1   

  1. 1. 烟台电力设计院有限责任公司,山东 烟台 264002;
    2. 国网山东省电力公司 烟台供电公司,山东 烟台 264000;
    3. 西安理工大学 水利水电学院,陕西 西安 710048
  • 修回日期:2013-12-10 出版日期:2014-06-18 发布日期:2015-12-08
  • 作者简介:王茂成(1964—),男,山东蓬莱人,高级工程师,从事110~1 000 kV输变电技术研究。E-mail: ytwmc99@163.com

Opening-Reconnecting Plan and Design Between Yu-Xin and Shen-Fu Transmission Line of 220 kV

WANG Mao-cheng1, 2, KANG kai2, LI Gang2, LIU Shu-hua1, 2, WANG Xing-han3, LIANG Yu1   

  1. 1. Yantai Electrical Power Design Institute, Yantai 264002, China;
    2. Shandong Electric Power Group Yantai Electric Company,Yantai 264001, China;
    3. Xi’an University of Technology, Xi’an 710048, China
  • Revised:2013-12-10 Online:2014-06-18 Published:2015-12-08

摘要: 烟台电网220 kV岗嵛站最高负荷为180 MW,220 kV新港站最高负荷为170 MW,由220 kV嵛福线和汤新线串供。若220 kV汤新线、嵛福线任一线路故障跳闸,则余下另一回线路带220 kV岗嵛站和新港站共350 MW负荷运行,220 kV嵛福线、汤新线允许电流均为845 A,线路超流12%。若在220 kV沈福线、嵛新线交叉跨越处进行开断、改接后,将形成220 kV沈余站到岗嵛站、220 kV新港站到福山站两回线路。经计算,潮流、稳定、N-1方式下潮流均无问题。但在施工期间,需220 kV沈福线、嵛新线、霞沙线3条线路同时停电,对电网安全运行影响较大。为此,设计人员提出3个设计方案,并进行技术经济比较,最终确定同塔双回异侧T接的最优设计方案,并付诸实施,迎接夏季用电高峰。

关键词: 输电线路, 220 kV, 开断改接, 方案设计

Abstract: The maximum load of 220 kV Gang-yu substation and 220 kV Xin-gang substation are up to 180 MW and 170 MW respectively. Both substations are serially connected to 220 kV Yu-fu line and Tang-xin line. In case that one of the 220 kV Tang-xin line and Yu-fu lines has been tripped after fault, the rest will run both 220 kV Gang-yu substation and 220 kV Xin-gang substation, and the maximum load may be over 350 MW. The permissible currents of 220 kV Yu-fu line, Tang-xin line are 845 A. As a result, it will cause the current surpassing the permission of the line over 12%. Consequently, the proposal which reconnects the lines after the crisscross lines are unfolded and makes two new lines, one of which is from 220 kV Shen-yu substation to Gang-yu substation and the another is from 220 kV Xin-gang substation to Fu-shan substation is developed. According to this proposal’s computation, there are no negative effects on the power flow, stability under the N-1 operation condition of grid. However, there are numbers of negative influences on grid during the project construction because the 220 kV Shen-fu line, Yu-xin line and Xia-sha line must be cut off simultaneously. For this reason, three new proposals are developed. By technical and economic comparison of the proposals, the proposal of T-link on another side of the one-tower double-circuits is chosen as the optimal one to be applied to supply the peak load in summer.

Key words: transmission line, 220 kV, unfold-reconnection, embodiment design

中图分类号: