[1] 许锐锋. 西门子汽轮机汽门快关问题分析[J]. 华电技术,2014,36(10):51-53. XU Ruifeng. Analysis on fast close problem of governing valve of Siemens steam turbine[J]. Huadian Technology, 2014, 36(10): 51-53. [2] 俞友群. 西门子T-3000 DEH系统甩负荷识别功能的分析[J]. 浙江电力,2014(7):54-56. YU Youqun. Analysis on load shedding recognition of Siemens T-3000 DEH system [J]. Zhejiang Electric Power, 2014(7): 54-56. [3] 张宝,杨涛,项谨,等. 电网瞬时故障时汽轮机汽门快控误动作原因分析[J]. 中国电力,2014,47(5):25-28. ZHANG Bao, YANG Tao, XIANG Jin, et al . Cause analysis on steam turbine valve control misoperation during grid instantaneous faults [J]. Electric Power, 2014, 47(5): 25-28. [4] 李锦双,王师. 电网故障导致1 000 MW发电机组跳闸分析及解决对策[J]. 中国高新技术企业,2016(19):126-127. [5] 田丰,陈兴华,罗向东. 完善机组涉网控制提高电网可靠性[J]. 电力系统及自动化学报,2010,22(1):116-119. TIAN Feng, CHEN Xinghua, LUO Xiangdong. Perfect of unit control functions with grid to improve reliability of grid [J]. Proceedings of the CSU-EPSA, 2010, 22(1): 116-119. [6] 林圣. 基于暂态量的高压输电线路故障分类与定位方法研究[D]. 成都:西南交通大学,2011. LIN Sheng. Study on fault classification and fault location methods based on transient signals for high voltage transmission lines [D]. Chengdu: Southwest Jiaotong University, 2011. [7] 邓秋玲,彭晓,张桂湘. 电网故障下直驱风电系统网侧变流器的电网同步化技术[J]. 高电压技术,2012,38(6):1473-1479. DENG Qiuling, PENG Xiao, ZHANG Guixiang. Grid synchronization of grid-side converter in direct drive wind power generation system under grid faults [J]. High Voltage Engineering, 2012, 38(6): 1473-1479. [8] 姚骏,廖勇,唐建平. 电网短路故障时交流励磁风力发电机不脱网运行的励磁控制策略[J]. 中国电机工程学报,2007,27(30):64-71. YAO Jun, LIAO Yong, TANG Jianping. Ride-through control strategy of AC excited wind-power generator for grid short-circuit fault [J]. Proceedings of the CSEE, 2007, 27(30): 64-71. [9] 魏新泉,常喜强,鲁新,等. 关停小机组对电网安全稳定性的影响[J]. 热电技术,2012(2):53-56. WEI Xinquan, CHANG Xiqiang, LU Xin, et al . Infulence of grid stability with small units shut-down[J]. Cogeneration Power Technology, 2012(2): 53-56. [10] 段学友,周菁,郭瑞君,等. 660 MW超超临界直接空冷机组FCB逻辑优化及功能实现[J]. 电站系统工程,2016,32(4):42-45. DUAN Xueyou, ZHOU Jing, GUO Ruijun, et al . FCB logic optimization and function implementation of 660 MW ultra supercritical direct air cooling unit [J]. Power System Engineering, 2016, 32(4): 42-45. [11] 赵霞,周家启,赵渊. 含异步化同步发电机电力系统小扰动功角稳定性的概率分析[J]. 中国电机工程学报,2009,29(28):68-74. ZHAO Xia, ZHOU Jiaqi, ZHAO Yuan. Probabilistic small disturbance rotor angle stability analysis for multi-machine power systems including asynchronized generators [J]. Proceedings of the CSEE, 2009, 29(28): 68-74. [12] 陈宗金,姜宪珍,苑举伟,等. 300 MW机组中汽门快关控制分析[J]. 电力建设,2006,27(2):18-21. CHEN Zongjin, JIANG Xianzhen, YUAN Juwei, et al . Analysis on quick close control for intermediate regulating valve of 300 MW [J]. Electric Power Construction, 2006, 27(2): 18-21. [13] 王会. 西门子1 000 MW汽轮机DEH控制逻辑优化[J]. 中国电力,2014,47(9):6-10. WANG Hui. Optimization on control logics of Siemens DEH system for 1 000 MW steam turbines [J]. Electric Power, 2014, 47(9): 6-10. |