[1] |
MCKINSEY. Big data:The next frontier for innovation, competition, and productivity[R/OL]. (2011-05)[2017-02-17]. https://www.mckinsey.com/business-functions/digital-mckinsey/our-insights/big-data-the-next-frontier-for-innovation.
|
[2] |
Gartner:The top ten strategic technology trend for 2012[EB/OL].(2011-11-05)[2017-02-17]. https://www.gartner.com/technology/research/top-10-technology-trends/.
|
[3] |
王昭力. 大数据时代下发电集团数字化管控[J]. 中国电力企业管理, 2017(1):58-59
|
[4] |
孙栓柱, 代家元, 周春蕾, 等. 基于大数据的供热机组调峰能力研究与应用[J]. 中国电力, 2016, 49(7):82-85 SUN Shuanzhu, DAI Jiayuan, ZHOU Chunlei, et al. Research and application of regulation capacity of heating units based on big data[J]. Electric Power, 2016, 49(7):82-85
|
[5] |
吕守旭. 基于大数据分析的智能电网降损效果估计模型仿真[J]. 中国电力, 2017, 50(4):172-175 LV Shouxu. Estimation model simulation on the loss-reduction effect of smart grid based on big data analysis[J]. Electric Power, 2017, 50(4):172-175
|
[6] |
耿清华, 马越, 冯治国. 新形势下水力发电企业建设智慧检修的思考[J]. 水电与新能源, 2017(12):44-45, 64 GENG Qinghua, MA Yue, FENG Zhiguo. Development of the intelligent maintenance in hydropower companies under new situations[J]. Hydropower and New Energy,, 2017(12):44-45, 64
|
[7] |
罗军舟, 金嘉晖, 宋爱波, 等. 云计算:体系架构与关键技术[J]. 通信学报, 2011, 32(7):3-21 LUO Junzhou, JIN Jiahui, SONG Aibo, et al. Cloud computing:architecture and key technologies[J]. Journal on Communications, 2011, 32(7):3-21
|
[8] |
李志刚, 朱志军. 大数据:大价值、大机遇、大变革[M].北京:电子工业出版社, 2012:182.
|
[9] |
杨新民, 陈丰, 曾卫东, 等. 智能电站的概念及结构[J]. 热力发电, 2015, 44(11):10-13 YANG Xinmin, CHEN Feng, ZENG Weidong, et al. Concept and structure of intelligent power stations[J]. Thermal Power Generation, 2015, 44(11):10-13
|
[10] |
陈世和.智能电站发展现状及展望[C]//智能化电站技术发展研讨暨电站自动化2013年年会论文集.2013:30-40.
|
[11] |
杨新民, 高海东, 陈丰. 数字化电厂概念的解析及探讨[J]. 热力发电, 2015, 44(5):99-101 YANG Xinmin, GAO Haidong, CHEN Feng. Discussions on concept of digital power plant[J]. Thermal Power Generation, 2015, 44(5):99-101
|
[12] |
张学孟, 刘智铭. 数字化电厂建设的关键技术及发展[J]. 广东电力, 2012, 25(9):35-38 ZHANG Xuemeng, LIU Zhiming. Key technologies and development of digital power plant construction[J]. Guangdong Electric Power, 2012, 25(9):35-38
|
[13] |
雷军, 叶航军, 武泽胜, 等. 基于开源生态系统的大数据平台研究[J]. 计算机研究与发展, 2017, 54(1):80-93 LEI Jun, YE Hangjun, WU Zesheng, et al. Big-data platform based on open source ecosystem[J]. Journal of Computer Research and Development, 2017, 54(1):80-93
|
[14] |
王远, 陶烨, 蒋英明, 等. 智能电网时序大数据实时处理系统[J]. 计算机应用, 2015, 35(S2):88-92 WANG Yuan, TAO Ye, JIANG Yingming, et al. Real-time processing system for time series big data in smart power grid[J]. Journal of Computer Applications, 2015, 35(S2):88-92
|
[15] |
李志刚, 朱志军. 大数据:大价值、大机遇、大变革[M]. 北京:电子工业出版社, 2012:182.
|
[16] |
王大鹏, 杜保华, 孙玺, 等. 锅炉重要部件风险评估与管理技术研究[J]. 热力发电, 2009, 42(9):70-73 WANG Dapeng, DU Baohua, SUN Xi, et al. Risk assessment and management technology of important components in boilers[J]. Thermal Power Generation, 2009, 42(9):70-73
|
[17] |
于新颖, 王浩. 火电厂主要辅机能耗现状与节能潜力分析[J]. 电站辅机, 2009, 108(1):1-4 YU Xinying, WANG Hao. Status of energy consumption and analysis of its potential energy saving of major auxiliary equipment in thermal power plant[J]. Power Station Auxiliary Equipment, 2009, 108(1):1-4
|
[18] |
姜东升. 基于节能环保的大型火电厂热机设备选型优化[J]. 电力建设, 2013, 34(10):84-85 JIANG Dongsheng. Optimization of heat engine equipment selection for large thermal power plant based on energy conservation and environment protection[J]. Electric Power Construction, 2013, 34(10):84-85
|
[19] |
刘旭. 基于大数据的风功率预测模型优化研究与实现[D]. 保定:华北电力大学, 2016:2-5.
|
[20] |
中国电机工程学会信息化专委会. 中国电力大数据发展白皮书[R]. 北京:中国电机工程学会. 2013. 3:17-18.
|