[1] 白建华,张钦,辛颂旭,等. 风电利用水平评价关键指标研究[J]. 中国电力,2012,45(11):7-12. BAI Jianhua, ZHANG Qin, XIN Songxu, et al . Research on key indexes comparison of wind power utilization level[J]. Electric Power, 2012, 45(11): 7-12. [2] 张运洲,胡泊. “三北”地区风电开发、输送及消纳研究[J]. 中国电力,2012,45(9):1-6. ZHANG Yunzhou, HU Bo. Study on wind power exploitation, transmission and accommodation in northern region of China [J]. Electric Power, 2012, 45(9): 1-6. [3] HENRIK L, WOODROW W. Management of fluctuations in wind power and CHP comparing two possible Danish strategies[J]. Energy, 2002, 27(5): 471-483. [4] LUND H, MATHIESEN B V. Energy system analysis of 100% renewable energy systems-the case of Denmark in years 2030 and 2050 [J]. Energy, 2009, 34(5): 524-531. [5] MATHIESEN B V, LUND H. Comparative analyses of seven technologies to facilitate the integration of fluctuating renewable energy sources[J]. IET Renewable Power Generation, 2009, 3(2):190-204. [6] 王彩霞,李琼慧,谢国辉. 风电供热提高低谷风电消纳能力评估[J]. 中国电力,2013,46(12):100-106. WANG Caixia, LI Qionghui, XIE Guohui. Evaluation of wind power heating in facilitating wind power integration capability during valley load period [J]. Electric Power, 2013, 46(12): 100-106. [7] 李伟,姜璐. 利用弃风蓄热供暖经济性评价[J]. 农村电气化,2014 (9):51-53. LI Wei, JIANG Lu. The economic evaluation of heat storage using abandon wind for heating[J]. Rural Electrification, 2014, (9): 51-53. [8] 吕泉,姜浩,陈天佑,等. 基于电锅炉的热电厂消纳风电方案及其国民经济评价[J]. 电力系统自动化,2014,38(1):6-12. LV Quan, JIANG Hao, CHEN Tianyou, et al . Wind power accommodation by combined heat and power plant with electric boiler and its national economic evaluation[J]. Automation of Electric Power Systems, 2014, 38(1): 6-12. [9] 刘纯,曹阳,黄越辉,等. 基于时序仿真的风电年度计划制定方法[J]. 电力系统自动化,2014,38(11):13-19. LIU Chun, CAO Yang, HUANG Yuehui, et al . An annual wind power planning method based on time sequential simulations[J]. Automation of Electric Power Systems, 2014, 38(11): 13-19 |