中国电力 ›› 2017, Vol. 50 ›› Issue (10): 52-56.DOI: 10.11930/j.issn.1004-9649.20160209

• 电网 • 上一篇    下一篇

特高压变电工程设计与施工衔接安全防护措施研究

熊织明1, 刘建楠1, 倪向萍1, 戴挈军2, 李盈盈1, 王小松1, 张达1   

  1. 1. 国家电网公司交流建设分公司,北京 100052;
    2. 江苏省送变电公司,江苏 南京 210028
  • 收稿日期:2016-02-16 出版日期:2017-10-25 发布日期:2017-10-30
  • 作者简介:熊织明(1966—),男,四川夹江人,高级工程师,从事输变电建设管理和施工技术工作。E-mail: zhiming-xiong@sgcc.com.cn
  • 基金资助:
    国家电网公司科技项目(SHJJGC1500137)

Research on Safety Protective Measures for Effective Connection Between Design and Construction in UHV Substation Projects

XIONG Zhiming1, LIU Jiannan1, NI Xiangping1, DAI Qiejun2, LI Yingying1, WANG Xiaosong1, ZHANG Da1   

  1. 1. State Grid AC Engineering Construction Branch, Beijing 100052, China;
    2. Jiangsu Power Transmission and Transformation Corporation, Nanjing 210028, China
  • Received:2016-02-16 Online:2017-10-25 Published:2017-10-30
  • Supported by:
    This work is supported by the Science and Technology Project of SGCC (No. SHJJGC1500137).

摘要: 特高压变电工程施工过程具有难度大、安全风险高等突出特点,为保证施工人员及设备的安全,有必要在工程设计阶段充分考虑后续施工作业的可行性和施工过程的安全性。梳理了高空作业安全绳使用不符合规定和施工用缆风绳、牵引绳使用不符合规定等2类特高压变电工程中因设计与施工未有效衔接导致的主要“受迫性违章”,提出了有针对性的安全防护措施,从设计源头上为施工过程中有关安全管理规定的落地提供条件。所提出的安全防护措施已经在淮南—南京—上海特高压交流输变电工程变电工程中应用,达到了预期效果。

关键词: 特高压变电工程, 安全防护, 受迫性违章, 施工设计, 防护措施

Abstract: At present, UHV projects have already entered large-scale construction stage. UHV substation projects have difficult construction process and high security risks. In order to ensure construction personnel and equipment safety, it is necessary to fully consider feasibility and safety of construction process in engineering project design stage. Two typical kinds of forced regulation violation, caused by disconnection in safety between design and construction stage, are discussed in detail. The two violation cases are “misuse safety ropes in heighted work” and “rule violation of fixing cable wind ropes and traction cable”. Targeted safety protection measures, which consider conditions in engineering design stage for the implementation of relevant safety management rules in construction process, are put forward. Proposed safety protection measures have already been applied in Huainan-Nanjing-Shanghai UHV transmission and transformation project with anticipated effect.

Key words: UHV substation project, safety protection, forced illegal behavior, construction design, protective measures