[1] 解广润. 电力系统过电压[M]. 北京:水利电力出版社,1985. [2] 祝家麟. 边界元分析[M]. 北京:科学出版社,2009. [3] 杨德全. 边界元理论及应用[M]. 北京:北京理工大学出版社,2002. [4] 解福瑶,郑勤红,刘蔷蕊. 二维静电场分析的边界元场强计算问题[J]. 云南师范大学学报:自然科学版,1996,16(4):37-42. XIE Fu-yao, ZHENG Qin-hong, LIU Qiang-rui. The BEM electric field intensity computation problem of 2D electro static field ananlysis[J]. Journal of Yunnan Normal University: Natural Sciences Edition, 1996, 16(4): 37-42. [5] 姚振汉,杜庆华. 边界元法应用的若干近期研究及国际新进展[J]. 清华大学学报:自然科学版,2001,41(4/5):89-93. YAO Zhen-han, DU Qing-hua. Some recent investigations and new progresses in the application of boundary element methods[J]. Journal of Tsinghua University: Science and Technology, 2001, 41(4/5): 89-93. [6] 陈姝敏,杨兰均,张乔根,等. 110 kV电缆护层连接方式对护层过电压的影响[J]. 高电压技术,2006,32(3):37-39. CHEN Shu-min, YANG Lan-jun, ZHANG Qiao-gen, et al . Effect of sheath-bonding method on induced over-voltages in 110 kV XLPE cable system in the case of ground fault surge[J]. High Voltage Engineering, 2006, 32(3): 37-39. [7] 马任明. ATP-EMTP程序使用说明[Z]. 武汉:武汉高压研究所,1991. [8] 胡毅,胡建勋,刘凯. 特高压交直流线路带电作业人员的体表场强[J]. 高电压技术,2010,36(1):13-18. HU Yi, HU Jian-xun, LIU Kai. Field strength of body surface during the live working on the UHV AC and DC transmission lines [J]. High Voltage Engineering, 2010, 36(1): 13-18. [9] GB/T 6568—2008 带电作业用屏蔽服[S]. 北京:中国标准出版社,2008. [10] 沈建,刘伟东,刘鸿斌,等. 直升机巡视1 000 kV交流特高压线路的安全作业距离[J]. 中国电力,2011,44(5):41-45. SHEN Jian, LIU Wei-dong, LIU Hong-bin, et al . Safety distances of inspections on AC UHV lines of 1 000 kV with a helicopter[J]. Electric Power, 2011, 44(5): 41-45. [11] 金逸,肖匀,刘庭,等. 500 kV同塔四回线路不全停运检修作业方式研究[J]. 中国电力,2012,45(9):29-34. JIN Yi, XIAO Yun, LIU Ting, et al . Study on circuit service without total outage of the 500 kV transmission line of four circuits on one tower [J]. Electric Power, 2012, 45(9): 29-34. [12] 胡涛. 1 000 kV输电线路带电作业人员的安全防护研究[D]. 长沙:长沙理工大学,2007. [13] 张远健. 同塔多回输电线路带电作业可行性分析及作业方法研究[D]. 广州:华南理工大学,2011. |