[1] 广东核电培训中心. 900 MW压水堆核电站系统与设备[M]. 北京:原子能出版社,2005. [2] 郑滨,石俊英. 机组从100%满功率甩负荷到厂用电运行的核电站瞬态分析[J]. 核动力工程,2001,22(5):385-389. ZHENG Bin, SHI Jun-ying. Transient analysis of house load from 100%FP for nuclear power plant[J]. Nuclear Power Engineering, 2001, 22(5): 385-389. [3] 张小冬,刘琳. AP1000反应堆控制系统特点分析[J]. 核动力工程,2011,32(4):62-65. ZHANG Xiao-dong, LIU Lin. Analysis of AP1000 reactor power control system [J]. Nuclear Power Engineering, 2011, 32(4): 62-65. [4] 濮继龙. 大亚湾核电站运行教程[M]. 北京:原子能出版社, 1999. [5] 顾军. AP1000核电厂系统与设备[M]. 北京:原子能出版社, 2010. [6] 钱朝明,王会,吴永存,等. 1 000 MW火电机组协调控制策略优化[J]. 中国电力,2013,46(3):68-72. QIAN Chao-ming, WANG Hui, WU Yong-cun, et al . Optimization of coordinated control strategy for 1 000-MW thermal power units[J]. Electric Power, 2013, 46(3): 68-72. [7] 熊义强,林萌,刘鹏飞,等. CPR1000型核电站给水泵事故瞬态分析[J]. 原子能科学技术,2012,46(7):831-836. XIONG Yi-qiang, LIN Meng, LIU Peng-fei, et al . Transient analysis on failures of feed water pump at CPR1000 nuclear power plant [J]. Atomic Energy Science and Technology, 2012, 46(7): 831-836. [8] 张晋宾,周四维. 核电厂汽轮机防进水保护仪控设计[J]. 中国电力,2010,43(4):76-80. ZHANG Jin-bin, ZHOU Si-wei. Study on instrument and control design for the water damage prevention of steam turbines in nuclear power plant [J]. Electric Power, 2010, 43(4): 76-80. [9] 陈生林.秦山核电厂甩负荷试验[J]. 核动力工程,1993,14(3):193-199. CHEN Sheng-lin. The plant trip test for Qinshan NPP [J]. Nuclear Power Engineering, 1993, 14(3): 193-199. [10] 刘映尚,张伯明,谢昌. 具有大型核电站的电力系统的安全策略和措施[J]. 中国电力,2003,36(5):20-23. LIU Ying-shang, ZHANG Bo-ming, XIE Chang. Security strategy and measures for power system with large nuclear power plants[J]. Electric Power, 2003, 36(5): 20-23. [11] 谭金,黄岳峰,徐政. 基于Matlab-simulink的详细核电机组数学模型研究[J]. 中国电力,2013,46(7):18-23. TAN Jin, HUANG Yue-feng, XU Zheng. Study for a detailed nuclear power unit mathematical model based on Matlab-simulink[J]. Electric Power, 2013, 46(7): 18-23. [12] 阮良成,俞忠德,陈忠武,等. 秦山第二核电厂2号机组汽轮机误快速降负荷瞬态分析[J]. 核动力工程,2007,28(2):82-86. RUAN Liang-cheng, YU Zhong-de, CHEN Zhong-wu, et al . Analysis on spurious turbine runback of the Unit 2 at Qinshan Ⅱ NPP [J]. Nuclear Power Engineering, 2007, 28(2): 82-86. |