[1] 王翔,张成,沈全荣. 一次典型的定子接地故障分析与优化保 护原理[J]. 电力系统自动化,2006,30(11):52-55. WANG Xiang, ZHANG Cheng, SHEN Quan-rong. Typical analysis of stator ground fault and principle of optimal protection[J]. Automation of Electric Power Systems, 2006, 30(11): 52-55. [2] 毕大强,王祥珩,余高旺,等. 消弧线圈接地方式外加20 Hz电源定子接地保护的应用[J]. 电力系统自动化,2005,29(4):82-84. BI Da-qiang, WANG Xiang-heng, YU Gao-wang, et al . Application of injecting 20 Hz voltage based ground fault protection for generators grounded via Petersen-coil[J]. Automation of Electric Power Systems, 2005, 29(4): 82-84. [3] 毕大强,王祥珩,余高旺,等. 高准确度外加20 Hz电源定子单相接地保护的研制[J]. 电力系统自动化,2004,28(16):75-78. BI Da-qiang, WANG Xiang-heng, YU Gao-wang, et al .Development of a high accuracy stator ground fault protection by injecting 20 Hz voltage [J]. Automation of Electric Power Systems, 2004, 28(16): 75-78. [4] 毕大强, 王祥珩,桂林,等. 基于零序电压故障暂态分量的发电机定子单相接地保护方案研究[J]. 中国电机工程学报,2003, 23(11):39-44. BI Da-qiang, WANG Xiang-heng, GUI Lin, et al . Protection scheme based on the fault transient component of zero sequence voltage under the stator ground fault of generators [J]. Proceedings of the CSEE, 2003, 23(11): 39-44. [5] PRESTON R, KANDRAC J. Report on design testing and commissioning of 100% stator ground fault protection at dominion’s bath county pumped-storage station[C]//Protective Relay Engineers Annual Conference. 2009, 62nd: 127-139. [6] 唐云龙,赵斌,郭宝甫,等. 定子接地基波零压和20 Hz低阻保护的一些问题探讨[J]. 继电器,2007,35(12):79-80. TANG Yun-long, ZHAO Bin, GUO Bao-fu, et al . The discussion of zero sequence voltage and 20 Hz low resistance protection for stator grounding fault [J]. Relay, 2007, 35(12): 79-80. [7] 兀鹏越,胡任亚,陈飞文,等. 1 036 MW机组的电气整套启动调试[J]. 电力建设,2010,31(7):103-104. WU Peng-yue, HU Ren-ya, CHEN Fei-wen, et al . First start-up and debugging test of complete electrical system of 1 036 MW unit [J]. Electric Power Constructions, 2010, 31(7):103-104. [8] 毕大强,刘春秋,葛宝明. 注入式发电机定子接地保护的自适应整定[J]. 电力系统自动化,2010,34(16):64-68. BI Da-qiang, LIU Chun-qiu, GE Bao-ming. Self-adaptive setting for injecting source based stator ground fault protection[J].Automation of Electric Power Systems, 2010, 34(16): 64-68. [9] 陈彦桥,薛翔宇,刘立衡,等. 大同二电厂7号机组协调控制系统优化[J]. 中国电力,2011,44(3):69-72. CHEN Yan-qiao, XUE Xiang-yu, LIU Li-heng, et al . Coordinated controlsystem optimization of No.7 unit in Datong 2nd Power Plant [J]. Electric Power, 2011, 44(3): 69-72. [10] 唐芳轩,张剑. 秦山第二核电厂发电机转子引线垫条断裂故障分析[J]. 中国电力,2011,44(1):53-55. TANG Fang-xuan, ZHANG Jian. Fracture malfunction analysis of underlay pieces of generator rotor lead-wire of Qinshan Phase Ⅱ Nuclear Power Plant [J]. Electric Power, 2011, 44(1): 53-55. [11] 朱晓星,刘武林,王伯春,等. 600 MW机组热工主要保护系统的分析及完善[J]. 中国电力,2010,43(3):42-45. ZHU Xiao-xing, LIU Wu-lin, WANG Bo-chun, et al . Analysis and optimization on the main protection system of thermal process in 600 MW units [J]. Electric Power, 2010, 43(3): 42-45. [12] 张琦雪,陈佳胜,陈俊,等. 大型发电机注入式定子接地保护判据的改进[J]. 电力系统自动化,2008,32(3):67-68. ZHANG Qi-xue, CHEN Jia-sheng, CHEN Jun, et al . Improvement on criterions of stator earth fault protection with voltage injection for large-sized generators [J]. Automation of Electric Power Systems, 2008, 32(3): 67-68. [13] 贺家李,宋从矩. 电力系统继电保护原理[M]. 增订版. 北京:中国电力出版社,2004:298-302. [14] 范鑫,秦建明,刘静宇,等. 超临界600 MW汽轮机低负荷运行优化技术研究[J]. 中国电力,2012,45(11):18-21. FAN Xin, QIN Jian-ming, LIU Jing-yu, et al . Study on optimization of low load operation for supercritical 600-MW steam turbines[J].Electric Power, 2012, 45(11): 18-21. [15] 刘小波,包明磊. 百万千瓦机组注入式定子接地保护的研究与开发[J]. 华电技术,2008,30(7):37-41. LIU Xiao-bo, BAO Ming-lei. The research and development on injection scheme for stator ground protection of 1 000 MW generator [J]. Huadian Technology, 2008, 30(7): 37-41. |