[1] 刘哲,王松岭,王鹏. 300 MW机组单元制循环水系统优化运行[J]. 汽轮机技术,2010,52(6):475-477. LIU Zhe, WANG Song-ling, WANG Peng. Optimal operation of circulating water system in 300MW unit system[J]. Turbine Technlolgy, 2010, 52(6): 475-477. [2] 费全昌,梁超. 火力发电厂湿式冷却系统节能分析[J]. 中国电力,2012,45(9):68-71. FEI Quan-chang, LIANG Chao. Analysis on energy saving for water cooling system in thermal power plants[J]. Electric Power,2012, 45(9): 68-71. [3] 刘桂生,马骏驰,丁平,等. 循环水泵电动机双速改造[J]. 热力发电,2008,37(2):66-67. LIU Gui-sheng, MA Jun-chi, DING Ping, et al . Retrofitting electric motor of circulating water pump into a double-speed one[J]. Thermal Power Generation, 2008, 37(2): 66-67. [4] 张震伟,谢尉扬,王舰. 不同容量循环水泵配置的节能研究[J].电力建设,2012,33(4):76-79. ZHANG Zhen-wei, XIE Wei-yang, WANG Jian. Research on energy-saving for circulating water pump with unequal capacities[J]. Electric Power Construction, 2012, 33(4): 76-79. [5] 翟伟明. 600 MW机组循环水泵变频改造后运行方式优化[J]. 发电设备,2012,26(3):183-185. QU Wei-ming. Operation optimization of the circulating pump for a 600 MW power unit after its frequency conversion retrofit[J]. Power Equipment, 2012, 26(3): 183-185. [6] 李勇,曹祖庆. 凝汽器清洁率的概念及测试方法[J]. 汽轮机技术,1995,37(2):73-76. LI Yong, CAO Zu-qing. The concept of condenser cleaning rate and test method [J]. Turbine Technlolgy, 1995, 37(2): 73-76. |