[1] 黎灿兵,傅美平,梁锦照,等. 基于网络协调程度评估的电网建设项目优化排序方法[J]. 电力系统保护与控制,2010,38(17):112-120. LI Canbing, FU Meiping, LIANG Jinzhao, et al, Optimization sequencing for grid construction projects based on evaluation of network coordination[J]. Power System Protection and Control, 2010, 38(17): 112- 120. [2] 宋伶俐,杨军,周博文,等. 一种电网基建项目辅助决策方法[J]. 电力自动化设备,2013,33(6):64-69. SONG Lingli, YANG Jun, ZHOU Bowen, et al. Assistant decision making scheme for construction projects of power network [J]. Electric Power Automation Equipment, 2013, 33(6): 64-69. [3] 彭定武. 中山电网投资优化模型及应用研究[D]. 广州:华南理工大学,2013. [4] 葛少云,徐东星,刘洪,等. 基于项目库的两阶段项目综合决策优化[J]. 电力系统保护与控制,2012,40(22):118-128. GE Shaoyun, XU Dongxing, LIU Hong, et al. A two-stage integrated decision optimization method based on the established project library [J]. Power System Protection and Control, 2012, 40(22): 118-128. [5] 于滢. 供电企业电网建设投资优化方法与实施方案研究[D]. 北京:华北电力大学,2009. [6] 崔巍,崔莹莹,杨海峰. 电网专项领域投资决策模型[J]. 电力建设,2013,34(10):112-117. CUI Wei, CUI Yingying, YANG Haifeng. Investment decision model in special fields for power grid [J]. Electric Power Construction, 2013, 34(10): 112-117. [7] 罗毅,李昱龙. 基于熵权法和灰色关联分析法的输电网规划方案综合决策[J]. 电网技术,2013,37(1):77-81. LUO Yi, LI Yulong. Comprehensive decision-making of transmission network planning based on entropy weight and grey relational analysis[J]. Power System Technology, 2013, 37(1): 77-81. [8] 王瑞莲,赵万里. 基于模糊决策的城市高压输电网规划方案评价方法[J]. 电网技术,2013,37(2):488-492. WANG Ruilian, ZHAO Wanli. A fuzzy decision-based method to evaluate planning scheme for urban high voltage transmission network [J]. Power System Technology, 2013, 37(2): 488-492. [9] 聂宏展,聂耸,乔怡,等. 基于主成分分析法的输电网规划方案综合决策[J]. 电网技术,2010,34(6):134-138. NIE Hongzhan, NIE Song, QIAO Yi, et al. Comprehensive decision-making of alternative transmission network planning based on principal component analysis[J]. Power System Technology, 2010, 34(6): 134-138. [10] 聂宏展,吕盼,乔怡,等. 基于熵权法的输电网规划方案模糊综合评价[J]. 电网技术,2009,33(11):60-64. NIE Hongzhan, LV Pan, QIAO Yi, et al. Comprehensive fuzzy evaluation for transmission network planning scheme based on entropy weight method[J]. Power System Technology, 2009, 33(11): 60-64. [11] 高庆敏,张乾业. 基于SE-DEA的交叉效率模型的城市电网规划综合评判决策[J]. 电力系统保护与控制,2011,39(8):60-64. GAO Qingmin, ZHANG Qianye. Comprehensive evaluation and decision-making for urban power system planning using a cross efficiency model based on SE-DEA [J]. Power System Protection and Control, 2011, 39(8): 60-64. [12] 韩震焘,黄志伟,葛少云,等. 城市配电网综合评价体系[J]. 电网技术,2012,36(8):95-99. HAN Zhentao, HUANG Zhiwei, GE Shaoyun, et al. A comprehensive evaluation system of urban distribution network [J]. Power System Technology, 2012, 36(8): 95-99. [13] 黄志伟,葛少云,罗俊平,等. 城市配电网发展策略探讨[J]. 电力系统及其自动化学报,2011,23(6):111-115. HUANG Zhiwei, GE Shaoyun, LUO Junping, et al. Discussion on development strategy of urban distribution networks [J].Proceedings of the CSU-EPSA, 2011, 23(6): 111-115. [14] 彭飘,廖志伟,文福拴,等. 基于根本原因法的数字化变电站故障诊断[J]. 电力系统自动化,2011,35(17):61-66. PENG Piao, LIAO Zhiwei, WEN Fushuang, et al. A root cause analysis based fault diagnosis approach for digital substations [J]. Automation of Electric Power Systems, 2011, 35(17): 61-66. [15] 郭亚军,易平涛. 线性无量纲化方法的性质分析[J]. 统计研究,2008,25(2):93-100. GUO Yajun, YI Pingtao. Character analysis of linear dimensionless methods [J]. Statistical Research, 2008, 25(2): 93-100. [16] 胡永宏. 对统计综合评价中几个问题的认识与探讨[J]. 统计研究,2012,29(1):26-30. HU Yonghong. Understanding and discussion of some problems in statistical synthesis evaluation [J]. Statistical Research, 2012, 29(1): 26-30.
|