Operation Optimization and Reliability Evaluation of Integrated Energy System Based on Improved Timing Constraint Petri Net
HU Liexiang, WANG Lei, DONG Mingfeng, LI Hongzhong, SUN Ke, HU Zhesheng
Electric Power . 2020, (10): 123 -132,139 .  DOI: 10.11930/j.issn.1004-9649.202003183