[1] 陈裕忠,黄万启,卢怀钿,等. 1 000 MW超超临界机组长周期给水加氧实践效果分析与评价[J]. 中国电力,2013,46(12):43-47. CHEN Yu-zhong, HUANG Wan-qi, LU Huai-tian, et al . Analysis and assessment on effect of long-term oxygenated treatment for 1 000-MW ultra supercritical units[J]. Electric Power, 2013, 46(12): 43-47. [2] 王承亮. 1 000 MW机组凝结水系统优化改造研究[J]. 中国电力,2013,46(12):48-51. WANG Cheng-liang. Optimization of condensate circuit in 1 000-MW units [J]. Electric Power, 2013, 46(12): 48-51. [3] 陈颖敏,刘伟伟,李东亮,等. 凝结水精处理用阴离子交换树脂性能评价实验[J]. 中国电力,2011,44(3):56-59. CHEN Ying-min, LIU Wei-wei, LI Dong-liang, et al . Performance evaluation experiment of condensate water polishing treatment with anion resin [J]. Electric Power, 2011, 44(3): 56-59. [4] 慕晓炜,郑敏聪,李建华. 凝结水精处理混床运行控制指标分析与确定[J]. 热力发电,2013,42(10):134-136. MU Xiao-wei, ZHENG Min-cong, LI Jian-hua. Operation and control of the condensate polishing mixed beds [J]. Thermal Power Generation, 2013, 42(10): 134-136. [5] 曹长武,宋丽莎,罗竹杰. 火力发电厂化学监督技术[M]. 北京:中国电力出版社,2005. [6] 周柏青,陈志和. 热力发电厂水处理[M]. 4版. 北京:中国电力出版社,2009. [7] 外高桥第二发电有限责任公司.化水运行规程[R]. 2013. |