[1] 孙长生,朱北恒,王建强,等. 提高电厂热控系统可靠性技术研究[J]. 中国电力,2009,42(2):56-59. SUN Chang-sheng, ZHU Bei-heng, WANG Jian-qiang, et al . Research on technologies to improve the reliability of I & C system for power plants [J]. Electric Power, 2009, 42(2): 56-59. [2] GA/T 670—2006 安全防范系统雷电浪涌防护技术要求[S]. 中国标准出版社,2007. [3] 高天云. 雷电侵害DCS的途径及防范措施[J]. 中国电力,2005, 38(5):73-76. GAO Tian-yun. The lightning disturbances on DCS and preventive measures [J]. Electric Power, 2005, 38(5): 73-76. [4] 孙长生. 热控系统防雷接地与抗干扰技术研讨报告[R]. 杭州:浙江省电力试验研究院,2011. [5] 李建国,陈统钱,丁俊宏,等. 提高乐清发电厂热控系统可靠性的技术措施[J]. 电力建设,2012,33(8):70-73. LI Jian-guo, CHEN Tong-qian, DING Jun-hong, et al . Technical measures for improvement of thermal control system reliability in Yueqing Power Plant[J]. Electric Power Construction, 2012, 33(8): 70-73. [6] 魏克新,张海梅,梁斌. 电源线传导电磁干扰测试方法的研究[J]. 华东电力,2010,38(9):1339-1343. WEI Ke-xin, ZHANG Hai-mei, LIANG Bin. Study on test method of electromagnetic interface conducted by power line[J]. East China Electric Power, 2010, 38(9): 1339-1343. |