Electric Power ›› 2025, Vol. 58 ›› Issue (8): 130-138.DOI: 10.11930/j.issn.1004-9649.202311142

• New-Type Power Grid • Previous Articles     Next Articles

Stochastic Optimization Strategy for Load Management of Industrial Park Under Energy Constraints

RU Chuanhong1(), LU Ji1(), QIN Jian1(), ZHANG Junda2, CHANG Junxiao1, JIANG Beini1   

  1. 1. State Grid Taizhou Power Supply Company, Taizhou 318000, China
    2. State Grid Zhejiang Integrated Energy Service Company, Hangzhou 310016, China
  • Received:2023-11-30 Online:2025-08-26 Published:2025-08-28
  • Supported by:
    This work is supported by Science and Technology Project of State Grid Zhejiang Electric Power Co., Ltd. (No.5211TZ230002) & National Natural Science Foundation of China (No.52107122).

Abstract:

In order to solve the load management problem of industrial park microgrids in the event of energy shortage, this paper proposes a new method for managing user-specific loads. By defining the user-specific load management as a stochastic predictive model control problem, this method firstly establishes prediction models for photovoltaic and users’ power demand, and then solve them using two-stage stochastic programming and approximate dynamic programming. Finally, the effectiveness of the alternative solutions is tested through two controllers in an environment in which user response to the load management is simulated. The results indicate that even if the controller does not have a complete model of user response, the predictive models used for scheduling the load management can significantly improve the power availability and user consumption efficiency.

Key words: industrial park, load management, random prediction model, two stage stochastic programming, approximate dynamic programming