[1] 王清,黄葆华,伍小林,等. 1 000 MW典型机组甩负荷试验[J].中国电力,2011,44(5):65-69. WANG Qing, HUANG Bao-hua, WU Xiao-lin, et al . Steam turbine load rejection test of typical 1 000 MW unit[J]. Electric Power, 2011, 44(5): 65-69. [2] WAMKEUE R, JOLETTE C, KAMWA I. Alternative approaches for linear analysis and prediction of a synchronous generator under partial-and full-load rejection tests[J]. IET Electric Power Applications, 2007, 1(4): 581-590. [3] SWIDENBANK E, BROWN M D, FLYNN D. Self-tuning turbine generator control for power plant [J]. Mechatronics, 1999, 9(5): 513-537. [4] 冯伟忠. 大机组实现快速甩负荷的现实性和技术分析[J]. 动力工程,2008,28(4):532-536,547. FENG Wei-zhong. Practicability and technical analysis of implementing fast cut back(FCB) for great capacity power units[J]. Journal of Power Engineering, 2008, 28(4): 532-536, 547. [5] 唐飞,董斌,赵敏. 超超临界机组在我国的发展及应用[J]. 电力建设,2010,31(1):80-82. TANG Fei, DONG Bin, ZHAO Min. USC unit development and application in China [J]. Electric Power Construction, 2010, 31(1): 80-82. [6] 冯伟忠. 900 MW 超临界机组FCB 试验[J]. 中国电力,2005,38(2):74-77. FENG Wei-zhong. FCB test for 900 MW supercritical units[J]. Electric Power, 2005, 38(2): 74-77. [7] 牛卫东. 单元机组运行[M]. 北京:中国电力出版社,2009. NIU Wei-dong. The unit operation[M]. Beijing: China Electric Power Press, 2009. [8] HAMMONS T J, YEO R L, GWEE C L, et al . Enhancement of power system transient response by control of HVDC converter power [J]. Electric Machines and Power Systems, 2000, 28(3): 219-241. [9] 冯伟忠. 1 000 MW 级火电机组旁路系统作用及配置[J]. 中国电力,2005,38(8):53-56. FENG Wei-zhong. Functions and configuration of the bypass system for 1 000 MW class coal-fired power generation units[J].Electric Power, 2005, 38(8): 53-56. [10] 魏铁铮,郑长庆,应学军. 陡河发电厂200 MW机组锅炉低温再热器改造可行性研究[J]. 华北电力技术,2001(8):20-21. WEI Tie-zheng, ZHEN Chang-qing, YIN Xue-jun. Feasibility study on low temperature re-heater improvement of 200 MW boiler unit of Douhe Power Plant [J]. North China Electric Power,2001(8): 20-21. [11] 冯伟忠. 1 000 MW超超临界机组FCB试验[J]. 中国电力,2008, 41(10):62-66. FENG Wei-zhong. FCB test on 1 000 MW ultra-supercritical power generation unit [J]. Electric Power, 2008, 41(10): 62-66. [12] LU S, HOGG B W. Dynamic nonlinear modelling of power plant by physical principles and neural networks [J]. International Journal of Electrical Power & Energy Systems, 2000, 22(1): 67-78. [13] 阚伟民,蔡笋,谢诞梅,等. 超超临界1 000 MW机组甩负荷试验研究[J]. 热力发电,2011,40(5):73-76. KAN Wei-min, CAI Sun, XIE Dan-mei, et al . Study on load rejection test of ultra-supercritical 1 000 MW unit[J]. Thermal Power Generation, 2011, 40(5): 73-76. [14] 俞成立. 1 000 MW汽轮机组甩负荷试验分析[J].华东电力,2007,35(6):32-34. YU Cheng-li. Load rejection tests for 1 000 MW steam turbine units [J]. East China Electric Power, 2007, 35(6): 32-34. [15] 史小平,王子才. 汽轮机转速与功率同步控制新方法的仿真研究[J]. 系统仿真学报,2003,15(6):823-840. SHI Xiao-ping, WANG Zi-cai. Simulation study of a new method to synchronously control rotate speed and power of a steam turbine [J]. Journal of System Simulation, 2003, 15(6): 823-840. |