[1] 迟永宁,王伟胜,刘燕华,等. 大型风电场对电力系统暂态稳定性的影响[J]. 电力系统自动化,2006,30(15):10-14. CHI Yong-ning, WANG Wei-sheng, LIU Yan-hua, et al . Impact of large scale wind farm integration on power system transient stability[J]. Automation of Electric Power Systems, 2006, 30(15):10-14. [2] 陈宁,于继来. 基于电气剖分信息的风电系统有功调度与控制[J]. 中国电机工程学报,2008,28(6):51-58. CHEN Ning, YU Ji-lai. Active power dispatch and regulation of wind power system based on electrical dissecting information of electrical power network[J]. Proceedings of the CSEE, 2008, 28(6): 51-58. [3] 郑太一,冯利民,王绍然,等. 一种计及电网安全约束的风电优化调度方法[J]. 电力系统自动化,2010,34(15):71-74. ZHENG Tai-yi, FENG Li-min, Wang Shao-ran, et al . An optimized wind power dispatching method considering security constraints in the power grid[J]. Automation of Electric Power Systems, 2010, 34(15): 71-74. [4] 魏巍,王渝红,李兴源,等. 大型风电场建模及接入甘肃嘉酒电网仿真分析[J]. 电力系统自动化,2009,33(18):96-101. WEI Wei, WANG Yu-hong, LI Xing-yuan, et al . Simulation of large scale wind farms integration into Gansu Jiajiu power system[J]. Automation of Electric Power Systems, 2009, 33(18): 96-101. [5] 孟祥星,王宏.大规模风电并网条件下的电力系统调度[J]. 东北电力大学学报:自然科学版,2009,29(1):1-7. MENG Xiang-xing, WANG Hong. Electric system scheduling in the condition of synchronization of large-scale wind power[J]. Journal of Northeast Dianli University: Natural Science Edition, 2009, 29(1): 1-7. [6] 迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81. CHI Yong-ning, LIU Yan-hua, WANG Wei-sheng, et al . Study on impact of wind power integration on power system[J]. Power System Technology, 2007, 31(3): 77-81. [7] PALSSON M P, TOFTEVAAG T, UHLEN K, et al . Large-scale wind power integration and voltage stability limits in regional networks[C]// Proceedings of 2002 IEEE Power Engine Society Summer Meeting. Chicago, IL, USA, 2002: 762-769. [8] ACKERMANN T. Wind power in power system[M]. Chichester, West Sussex, UK: John Wiley& Sons Ltd, 2005. [9] 刘德伟,黄越辉,王伟胜,等.考虑调峰和电网输送约束的省级系统风电消纳能力分析[J].电力系统自动化,2011,35(22): 77-81. LIU De-wei, HUANG Yue-hui, WANG Wei-sheng, et al . Predicting the accommodation of wind energy in provincial system considering peak load and transmission regulation[J]. Automation of Electric Power Systems, 2011, 35(22): 77-81. [10] 刘阳,刘俊勇,陈磊,等. 大规模风电接入系统的备用优化分配研究[J].中国电力,2012,45(1):50-54. LIU Yang, LIU Jun-yong, CHEN Lei, et al . Optimal reserve distribution of a grid connected with large scale wind power[J]. Electric Power, 2012, 45(1): 50-54. [11] 鲍永胜,吴振升. 基于SVM的时间序列短期风速预测[J].中国电力,2011,44(9):61-64. BAO Yong-sheng, WU Zhen-sheng. Short-term wind speed forecasting base on SVM time-series method[J]. Electric Power, 2011, 44(9): 61-64. [12] 李洪涛,马志勇,芮晓明. 基于数值天气预报的风能预测系统[J] .中国电力,2012,45(2):64-68. LI Hong-tao, MA Zhi-yong, RUI Xiao-ming. Foresting system based on numerical weather prediction[J]. Electric Power, 2012, 45(2): 64-68. [13] 牛晨光,刘丛. 基于相空间重构的神经网络短期风电预测模型[J]. 中国电力,2011,44(11):73-77. NIU Chen-guang, LIU Cong. Neural network model for short-term wind power prediction based on phase space reconstruction[J]. Electric Power, 2011, 44(11): 73-77. [14] 范高峰,裴哲义,辛耀中. 风电功率预测的发展现状与展望[J]. 中国电力,2011,44(6):38-41. FAN Gao-feng, PEI Zhe-yi, XIN Yao-zhong. Wind power prediction achievement and prospect [J]. Electric Power, 2011, 44(6): 38-41. [15] GB/T 19963—2011 风电场接入电力系统技术规定[S]. |