[1] 唐涛,诸伟楠,杨仪松. 发电厂与变电站自动化技术及其应用[M]. 北京:中国电力出版社,2005. [2] 沈国荣,郑玉平,黄健. 变电站自动化发展综述[J]. 江苏电机工程,2000,19(4):1-5. SHEN Guo-rong, ZHENG Yu-ping, HUANG Jian. A summary of the development of substation automation[J]. Jiangsu Electrical Engineering, 2000, 19(4): 1-5. [3] 梁艺. 数字化变电站技术综述[J]. 广西电业,2010(10):112-116. LIANG Yi. Summary of digital substation technology [J]. Guangxi Electric Power, 2010(10): 112-116. [4] 高志远,吴仕萍,李勇. 智能变电站的技术特征[J]. 中国电力,2010, 43(S2): 41-44. GAO Zhi-yuan, WU Shi-ping, Li Yong. Technical characteristics of smart substation [J]. Electric Power, 2010, 43(S2): 41-44. [5] 韩本帅,孙中尉,崔海鹏,等. 智能变电站过程层时间同步方式研究[J]. 中国电力,2012,45(11):86-90. HAN Ben-shuai, SUN Zhong-wei, CUI Hai-peng, et al . Research on time synchronization mode in process level of smart substation[J]. Electric Power, 2012, 45(11): 86-90. [6] IEC 61850 Communication networks and systems in substation[S]. 2004. [7] IEC 61970 Energy management system application program interface (EM API)[S]. 2003. [8] 高志远,姚建国,曹阳,等. 公共信息模型和IEC 61850模型协调方案评析[J]. 电力系统自动化,2011,35(16):9-14. GAO Zhi-yuan, YAO Jian-guo, CAO Yang, et al . A survey of coordination scheme between CIM and IEC 61850 model [J].Automation of Electric Power Systems, 2011, 35(16): 9-14. [9] 姚建国,严胜,杨胜春,等. 中国特色智能调度的实践与展望[J]. 电力系统自动化,2009,33(17):16-20. YAO Jian-guo, YAN Sheng, YANG Sheng-chun, et al . Practice and prospects of intelligent dispatch with Chinese characteristics [J]. Automation of Electric Power Systems, 2009, 33(17): 16-20. [10] 辛耀中,陶洪铸,李毅松,等. 电力系统数据模型描述语言E[J]. 电力系统自动化,2006,30(10):48-51. XIN Yao-zhong, TAO Hong-zhu, LI Yi-song, et al . E language for electric power system model description [J]. Automation of Electric Power Systems, 2006, 30(10): 48-51. [11] 国家电网公司. 电网通用模型描述规范(CIM/E语言)(征求意见稿)[S]. 2011. [12] Q/GDW 215—2008 电力系统数据标记语言—E语言规范[S]. 2008. [13] Q/GDW 216—2008 电网运行数据交换规范[S]. 2008. [14] 国家电网公司. CIM/E电网物理模型描述与交换规范(试行)[S]. 2011. [15] 李钦,钱锋,顾全. 电网模型综合服务系统的开发和应用[J]. 电网技术,2010,34(8):194-198. LI Qin, QIAN Feng, GU Quan. Development and application of power grid model integrated server system[J]. Power System Technology, 2010, 34(8): 194-198. [16] 季学纯,陈鹏,翟明玉. 基于离线验证的电网模型维护框架及其流程设计[J]. 电力系统自动化,2011,35(6):51-54. JI Xue-chun, CHEN Peng, ZHAI Ming-yu. Framework and flow design of power grid model maintenance based on offline validation[J]. Automation of Electric Power Systems, 2011, 35(6):51-54. [17] 谢善益,高新华,周伊琳,等. IEC TC57 CIM 和 IEC 61850 SCL模型整合及UCIM构建[J]. 电力系统自动化,2009,33(17):61-65. XIE Shan-yi, GAO Xin-hua, ZHOU Yi-lin, et al . Integration of the IEC TC57 CIM with the IEC 61850 SCL model and modeling of the UCIM[J]. Automation of Electric Power Systems, 2009, 33(17): 61-65. [18] EPRI. Harmonizing the international electrotechnical commission common information model (CIM) and 61850 [R/OL]. [2010-05-07]. http://my.epri.com/portal/server.pt?Abstract_id=00000000000 1020098. [19] 姜彩玉,叶峰,许文庆,等. IEC 61850的变电站模型与IEC 61970主站模型转换[J]. 电网技术,2006,30(S):209-213. JIANG Cai-yu, YE Feng, XU Wen-qing, et al . Convertion between IEC 61850-based substation model and IEC 61970- based control center model [J]. Power System Technology, 2006, 30(S): 209-213. [20] 国网电力科学研究院. 数字化变电站和主站共享建模技术研究技术报告[R]. 2010. [21] 张海东,张鸿,宋鑫,等. SCD模型到CIM/E模型的转换方法[J]. 电力系统自动化,2012,36(15):91-95. ZHANG Hai-dong, ZHANG Hong, SONG Xin, et al . Model conversion method from smart substation SCD to control center CIM/E[J]. Automation of Electric Power Systems, 2012, 36(15):91-95. [22] 胡靓,王倩. 基于IEC 61850与61970的无缝通信体系的研究[J]. 电力系统通信,2007,28(12):15-20. HU Liang, WANG Qian.Research on seam less communication system based on IEC 61850 and 61970[J]. Telecommunications for Electric Power System, 2007, 28(12): 15-20. [23] 陈爱林,乐全明,冯军,等. 代理服务器在智能变电站和调度主站无缝通信中的应用[J]. 电力系统自动化,2010,34(20):99-102. CHEN Ai-lin, YUE Quan-ming, FENG Jun, et al . Application of IEC 61850 proxy server in seamless communication between smart substation and control center[J]. Automation of Electric Power Systems, 2010, 34(20): 99-102. |