中国电力 ›› 2018, Vol. 51 ›› Issue (12): 1-6,28.DOI: 10.11930/j.issn.1004-9649.201708122

• 燃气轮机技术专栏 • 上一篇    下一篇

E级联合循环供热机组调峰能力分析

张利1, 张子玉2, 孔祥灿2, 姚颢2, 谷青峰2, 于越2, 周伟伟2, 钱江波2, 孔筱叶3   

  1. 1. 国网天津市电力公司电力科学研究院, 天津 300384;
    2. 华北电力大学 动力工程系, 河北 保定 071003;
    3. 中国测试技术研究院辐射研究所, 四川 成都 610000
  • 收稿日期:2017-08-24 修回日期:2018-05-24 出版日期:2018-12-05 发布日期:2018-12-13
  • 作者简介:张利(1985-),男,硕士,高级工程师,从事热力系统计算研究,E-mail:zhanglihust@163.com
  • 基金资助:
    国家重点研发计划项目(2017YFC0704200);中央高校基本科研业务资助项目(2016MS103);广东省省级科技项目(2015B010101002)。

Analysis on Peak Load Regulation of E-stage Combined Cycle Heating Unit

ZHANG Li1, ZHANG Ziyu2, KONG Xiangcan2, YAO Hao2, GU Qingfeng2, YU Yue2, ZHOU Weiwei2, QIAN Jiangbo2, KONG Xiaoye3   

  1. 1. Tianjin Electric Power Science & Research Institute, Tianjin 300384, China;
    2. Department of Power Engineering, North China Electric Power University, Baoding 071003, China;
    3. National institute of measurement testing technology, Chengdu 610000, China
  • Received:2017-08-24 Revised:2018-05-24 Online:2018-12-05 Published:2018-12-13
  • Supported by:
    This work is supported by National Key R&D Program of China (No.2017YFC0704200), Fundamental Research Funds for the Central Universities (No.2016MS103) and Guangdong Province Provincial Science and Technology Project (No.2015B010101002).

摘要: 以PG9171E型燃气轮机为顶循环的联合循环机组作为研究对象,利用EBSILON软件搭建了燃气-蒸汽联合循环系统变工况模型,通过改变供热抽汽量以及相应边界条件,分析了抽汽量变化对联合循环调峰能力的影响情况。结果表明:在供热抽汽量0~135 t/h内,机组调峰裕度为32.16~213.65 MW。比较了不同抽汽量下联合循环机组最小、最大发电功率,发现随着抽汽量的增加,机组的最小发电功率增大而最大发电功率减小。研究结果可为联合循环机组的经济运行和电网调峰决策提供重要参考。

关键词: 联合循环, 变工况, 供热抽汽量, 调峰

Abstract: Taking the PG9171E gas turbine as the top cycle unit as the research object, the gas-steam combined cycle system model for varying operation conditions is established by using the EBSILON software. The influence of the extraction rate variation on the peak-shaving capacity of the combined cycle is analyzed by changing the steam extraction and boundary conditions. The results show that the peak regulation margin of the unit is 32.16~213.65 MW when the steam extraction is lower than 135t/h. The minimum and maximum generation power of the combined cycle unit with different extraction capacity are compared in this paper. It is found that the minimum generation power increases and the maximum generation power decreases with the increase of the extraction capacity. The results can provide an important reference for the economic operation of combined cycle units and the decision of power grid peak-shaving.

Key words: combined cycle, varying operation conditions, steam extraction, peak load regulation

中图分类号: