中国电力 ›› 2022, Vol. 55 ›› Issue (1): 220-228.DOI: 10.11930/j.issn.1004-9649.202103120

• 技术经济 • 上一篇    

一种新的发电设备利用水平评价指标及方法

安洪光, 靳坤坤, 吴立强, 董博, 刘志强, 李艺   

  1. 中国电力企业联合会, 北京 100761
  • 收稿日期:2021-03-19 修回日期:2021-11-24 出版日期:2022-01-28 发布日期:2022-01-20
  • 作者简介:安洪光(1959-),男,硕士,高级工程师(教授级),从事电力安全生产、科技环保和企业管理研究,E-mail:anhongguang@cec.org.cn;靳坤坤(1990-),男,硕士,工程师,从事能源电力统计分析、电力供需研究,E-mail:jinkunkun@cec.org.cn;吴立强(1982-),男,硕士,高级工程师,从事能源电力统计分析、电力供需研究,E-mail:wuliqiang@cec.org.cn;董博(1986-),男,通信作者,博士,高级工程师,从事电力规划设计研究,E-mail:dongbo@cec.org.cn
  • 基金资助:
    国家能源局2019年能源战略规划研究课题(2019-27)。

A New Index and Method for Evaluating Utilization Level of Power Generating Equipment

AN Hongguang, JIN Kunkun, WU Liqiang, DONG Bo, LIU Zhiqiang, LI Yi   

  1. China Electricity Council, Beijing 100761, China
  • Received:2021-03-19 Revised:2021-11-24 Online:2022-01-28 Published:2022-01-20
  • Supported by:
    This work is supported by Project of Energy Strategy and Planning Research of National Energy Administration (No. 2019-27).

摘要: 新能源发电快速发展带来发电装机结构不断发生变化,依据传统方法计算的分类型和全口径发电设备利用小时不能像以往那样直观反映发电设备利用率水平。提出了发电设备“基准利用小时”概念,定义了发电设备利用率指数为利用小时占基准利用小时的百分比,给出了设计利用小时和可比利用小时2组标准取值,在此基础上提出了利用率指数计算模型。通过不同地区、不同企业的利用小时与利用率指数的比较分析,验证了利用率指数能够在充分考虑发电类型容量结构的前提下,真实反映发电设备利用率水平,可为电力规划分析、企业项目管理提供新的更加科学合理的指标体系。

关键词: 发电设备利用小时数, 基准利用小时, 利用率指数, 发电设备利用水平, 评价方法

Abstract: The rapid development of new energy has brought about constant change of electricity generation structure, leading to the inability of the traditional availability hour to directly reflect the utilization level of power generating equipment. A concept of "benchmark availability hour" is thus proposed, and the availability index is defined as the ratio of availability hour to the benchmark availability hour. The reference values for the design availability hour and comparability availability hour are given respectively in the paper, and then an availability index calculation model is proposed. Through comparison of the generating equipment availability hours and availability indexes in different regions and different companies, it is proved that the availability index can factually reflect the utilization level of power generating equipment under the circumstance of generation structure being taken into consideration adequately. This new index and method can be used for power planning and project management.

Key words: generating equipment availability hour, benchmark availability hour, availability index, utilization level of power generating equipment, evaluation method