[1] 吕俊复,张建胜,岳光溪,等. 循环流化床锅炉运行与检修[M]. 2版. 北京:水利电力出版社,2005. [2] 李斌,李建锋,盛建华,等. 300 MW级循环流化床锅炉机组运行分析[J]. 中国电力,2012,45(2):35-39. LI Bin, LI Jian-feng, SHENG Jian-hua, et al . Status of 300 MW circulation fluidized bed boiler unit operation[J]. Electric Power, 2012, 45(2): 35-39. [3] 龚鹏,赵凯,向俊,等. 300 MW循环流化床锅炉机组床温特性及调整[J]. 中国电力,2011,44(3):47-51. GONG Peng, ZHAO Kai, XIANG Jun, et al . Characteristics and adjustment methods of bed temperature for 300 MW CFB boiler[J]. Electric Power, 2011, 44(3): 47-51. [4] 郑成航,程乐鸣,周星龙,等. 300 MW单炉膛循环流化床锅炉二次风射程的数值模拟[J]. 动力工程,2009,29(9):801-805. ZHENG Cheng-hang, CHENG Le-ming, ZHOU Xing-long, et al .Numerical simulation of secondary air penetration depth in a 300 MW single-furnace circulation fluidized bed boiler[J]. Journal of Power Engineering, 2009, 29(9): 801-805. |