[1] 孙献斌,黄中. 大型循环流化床锅炉技术与工程应用[M]. 北京:中国电力出版社,2009. [2] 孙献斌,于龙,时正海,等. 国产330 MW CFB锅炉设计研究[J]. 热力发电,2009,38(11):19-22. SUN Xian-bin, YU Long, SHI Zheng-hai, et al . Study on design of the first home-made CFB boiler used for 330 MW unit[J]. Thermal Power Generation, 2009, 38(11): 19-22. [3] SUN Xian-bin, JIANG Min-hua, YU Long, et al . Research and design of 330 MW circulating fluidized bed boiler[C]//Proceedings of the 7th International Symposium on Coal Combustion. Beijing: Tsinghua University, 2012: 423-425. [4] 孙献斌,蒋敏华,于龙,等. 国产大型CFB锅炉的开发研制与工程示范[J]. 中国电力,2008,41(3):38-42. SUN Xian-bin, JIANG Min-hua, YU Long, et al . R&D and demonstration of large domestic CFB boilers[J]. Electric Power, 2008, 41(3): 38-42. [5] 孙献斌,李志伟,时正海,等. 循环流化床锅炉紧凑式分流回灰换热器的试验研究[J]. 中国电力,2006,39(7):27-30. SUN Xian-bin, LI Zhi-wei, SHI Zheng-hai, et al . Experimental study on the compact splitting-type returning ash heat exchanger of CFB boilers [J]. Electric Power, 2006, 39(7): 27-30. [6] 孙献斌. 循环流化床锅炉放大特性与紧凑化设计[J]. 热力发电,2009,38(3):1-4,9. SUN Xian-bin. Scaling-up characters and compact design of CFB boilers [J]. Thermal Power Generation, 2009, 38(3): 1-4, 9. [7] 吴玉平,周嗣林. 300 MW 循环流化床锅炉床温控制系统[J]. 中国电力,2007,40(1):74-76. WU Yu-ping, ZHOU Si-lin. Bed temperature control of 300 MW CFB boiler [J]. Electric Power, 2007, 40(1): 74-76. [8] 董志乾,张聪,赵发家,等. 300 MW CFB锅炉外置式换热器特性分析[J]. 中国电力,2008,41(1):63-67. DONG Zhi-qian, ZHANG Cong, ZHAO Fa-jia, et al . Characteristic analysis of external heat exchanger of 300 MW CFB boiler [J]. Electric Power, 2008, 41(1): 63-67. [9] 赵志丹,郝德锋,黄晓华,等. 300 MW循环流化床空冷机组协调控制及其优化[J]. 热力发电,2009,38(6):83-87. ZHAO Zhi-dan, HAO De-feng, HUANG Xiao-hua, et al . Collaborative control and optimization of 300 MW air-cooled circulating fluidized bed unit[J]. Thermal Power Generation, 2009, 38(6): 83-87. [10] 曹兴伟,李明亮. 300 MW CFB锅炉控制与燃烧调整[J]. 云南电力技术,2006,34(10):28-29,38. CAO Xing-wei, LI Ming-liang. Control and combustion adjustment of 300 MW CFB boiler [J]. Yunnan Electric Power, 2006, 34(10): 28-29, 38. [11] 钟犁,徐正泉,曹辛卫,等. 300 MW循环流化床锅炉燃烧调整的试验研究[J]. 热力发电,2012,41(5):69-72,76. ZHONG Li, XU Zheng-quan, CAO Xin-wei, et al . Test study on combustion adjustment of one CFB boiler for 300 MW unit[J]. Thermal Power Generation, 2012, 41(5): 69-72, 76. [12] 张振伟,桑永福,宋继业. 330 MW循环流化床锅炉机组控制系统优化[J]. 热力发电,2011,40(11):71-75. ZHANG Zhen-wei, SANG Yong-fu, SONG Ji-ye. Optimization of the control system for CFB boiler of 330 MW unit[J]. Thermal Power Generation, 2011, 40(11): 71-75. |