[1] 毛晓明,吴小辰.南方交直流并联电网运行问题分析[J].电网技术,2004,28(2):5-13. MAO Xiao-ming, WU Xiao-chen. Analysis on operational problems in South China AC-DC hybrid power grid[J]. Power System Technology, 2004,28(2):5-13. [2] 陈水明,余占清,谢海滨,等.互联系统电磁暂态交互作用[J]. 高电压技术,2011,37(2):395-403; 2011,37(3):537-547. CHEN Shui-ming, YU Zhan-qing, XIE Hai-bin, et al . Transient interaction of HVAC and HVDC in converter station in HVDC[J]. High Voltage Engineering, 2011, 37(2): 395-403; 2011, 37(3):537-547. [3] WU Zhong-xi, ZHOU Xiao-xin. Power system analysis software package(PSASP)-An integrated power system analysis tool[C]//Proceedings POWERCON’98. 1998:7-11. [4] 韩祯祥,张琦,徐政. 电力系统分析软件的现状与发展[J]. 国际电力,1999 (1):51-54. HAN Zhen-xiang, ZHANG Qi, XU Zheng. Present status and future of electric power system analysis software packages[J]. International Electric Power for China,1999(1):51-54. [5] 张扬,陆承宇,杜振东.电力系统仿真软件PSS/E简介[J].华东电力,1997,25(1):6-9. ZHANG Yang, LU Cheng-yu, DU Zheng-dong. An introduction to electric simulation software-PSS/E[J]. East China Electric Power, 1997,25(1):6-9. [6] 汤涌.电力系统数字仿真技术的现状与发展[J].电力系统自动化,2002,26(17):66-70. TANG Yong. Present situation and development of power system simulation technologies[J]. Automation of Electric Power Systems,2002, 26(17):66-70. [7] 徐政,杨靖萍,段慧. 一种适用于电磁暂态仿真的等值简约方法[J]. 南方电网技术, 2007(1): 37-40. XU Zheng, YANG Jing-ping, DUAN Hui. An equivalent reduction method for electromagnetic transient simulation of large-scale power systems[J]. Southern Power System Technology, 2007(1): 37-40. [8] 翁华,徐政,王兴刚,等. 南方电网交直流系统的简化方法[J]. 电网技术,2012, 36(3): 108-112. WENG Hua, XU Zheng, WANG Xing-gang, et al . A reduction method for AC/DC system of China Southern Power Grid[J]. Power System Technology,2012, 36(3): 108-112. [9] 高鹏,胡铭,蔡汉生,等. 特高压直流输电系统实时闭环仿真建模[J]. 中国电力, 2010, 43(1): 20-24. GAO Peng, HU Ming, CAI Han-sheng, et al. Modeling studies on real-time closed-loop simulation of UHVDC transmission system[J]. Electric Power, 2010, 43(1): 20-24. [10] 于庆广,胥埴伦. 电力系统的电磁暂态与机电暂态混合仿真[J]. 中国电力, 2007, 40(11): 38-41. YU Qing-guang, XU Zhi-lun. Electromagnetic-electromechanical transient hybrid simulation in power system[J]. Electric Power, 2007,40(11): 38-41. [11] 周海强,鞠平,宋忠鹏,等, 基于动态相似度与等值缓冲区的电动机动态等值方法[J].电力系统自动化,2010,34(13): 24-27. ZHOU Hai-qiang, JU Ping, SONG Zhong-peng, et al . A dynamic equivalent method for induction motors based on dynamic similarity and buffer zone[J]. Automation of Electric Power Systems, 2010, 34(13): 24-27. [12] 许剑冰,薛禹胜,张启平,等.电力系统同调动态等值的述评[J]. 电力系统自动化, 2005,29(14): 91-95. XU Jian-bing, XUE Yu-sheng, ZHANG Qi-ping, et al . A critical review on coherency-based dynamic equivalences [J]. Automation of Electric Power Systems, 2005, 29(14): 91-95. [13] 彭伟,徐泰山. 电力系统动态等值中发电机的选择方法[J]. 电力系统自动化, 2010,34(14): 48-52. PENG Wei, XU Tai-shan. A generator selection method for power system dynamic equivalences [J]. Automation of Electric Power Systems, 2010,34(14): 48-52. [14] PSCAD user’s guide[R]. Manitoba HVDC Research Centre,2003. [15] 林良真,叶林.电磁暂态分析软件包PSCAD/EMTDC[J].电网技术,2000,24(1):65-66. LIN Liang-zhen, YE Lin. An introduction to PSCAD/EMTDC[J]. Power System Technology, 2000,24(1):65-66. [16] 石访.电磁暂态软件PSCAD/EMTDC的应用现状与展望[J]. 华东电力,2008,36(12):36-38. SHI Fang. Application of electromagnetic transient software PSCAD/ EMTDC and its prospects[J]. East China Electric Power, 2008, 36(12):36-38. [17] 鄂志君,房大中,王立伟,等.基于EMTDC的混合仿真算法研究[J]. 继电器,2005,33(8):47-51. E Zhi-jun, FANG Da-zhong, WANG Li-wei, et al . Research of hybrid simulation algorithm based on EMTDC[J]. Relay, 2005, 33(8):47-51. [18] Electranix Corporation. Introduction to E-TRAN[DB/OL].(2008- 11-19)[2011-11-02]).http:// www.electranix.com/etran.php. [19] PSSTME 31.0 program operation manual[R]. Siemens Power Transmission & Distribution Inc, 2007. |