[1] 李兆伟, 翟海保, 刘福锁, 等. 多馈入交直流混联受端电网直流接入能力研究评述[J]. 电力系统保护与控制, 2016, 44(8): 142-148. LI Zhaowei, ZHAI Haibao, LIU Fusuo, et al. DC access capability study for multi-infeed HVDC power transmission system[J]. Power System Protection and Control, 2016, 44(8): 142-148. (in Chinese).
[2] 覃琴, 郭强, 周勤勇, 等. 国网“十三五”规划电网面临的安全稳定问题及对策[J]. 中国电力, 2015, 48(1): 25-32. QIN Qin, GUO Qiang, ZHOU Qinyong, et al. The security and stability of power girds in 13th Five-Year Planning and countermeasures[J]. Electric Power, 2015, 48(1): 25-32.
[3] 邵瑶, 汤涌. 多馈入直流系统交互作用因子的影响因素分析[J]. 电网技术, 2013, 37(3): 794-799. SHAO Yao, TANG Yong. Analysis of influencing factors of multi-infeed HVDC system interaction factor[J]. Power System Technology, 2013, 37(3): 794-799.
[4] 王晶, 梁志峰, 江木, 等. 多馈入直流同时换相失败案例分析及仿真计算[J]. 电力系统自动化, 2015, 39(4): 141-146. WANG Jing, LIANG Zhifeng, JIANG Mu, et al. Case analysis and simulation of commutation failure in multi-infeed transmission systems[J]. Automation of Electric Power Systems, 2015, 39(4): 141-146.
[5] 王海军, 黄义隆, 周全. 高压直流输电换相失败响应策略与预测控制技术路线分析[J]. 电力系统保护与控制, 2014, 42(21): 124-131. WANG Haijun, HUANG Yilong, ZHOU Quan. Analysis of commutation failure response strategies and prediction control technology in HVDC[J]. Power System Protection and Control, 2014, 42(21): 124-131.
[6] 夏成军, 杨仲超, 周保荣, 等. 考虑负荷模型的多回直流同时换相失败分析[J]. 电力系统保护与控制, 2015, 43(9): 76-81. XIA Chengjun, YANG Zhongchao, ZHOU Baorong, et al. Analysis of commutation failure in multi-infeed HVDC system under different load models[J]. Power System Protection and Control, 2015, 43(9): 76-81.
[7] LI Hongwei, PENG Ganrong. Simulation study on anomalous commutation failure in multi-infeed HVDC systems[C] //2nd International Conference on Advances in Energy and Environmental Science, 2014.
[8] 娄素华, 杨天蒙, 吴耀武, 等. 含高渗透率风电的电力系统复合储能协调优化运行[J]. 电力系统自动化, 2016, 40(7): 30-35. LOU Suhua, YANG Tianmeng, WU Yaowu, et al. Coordinated optimal operation of hybrid energy storage in power system accommodated high penetration of wind power[J]. Automation of Electric Power Systems, 2016, 40(7): 30-35.
[9] 徐飞, 陈磊, 金和平, 等. 抽水蓄能电站与风电的联合优化运行建模及应用分析[J]. 电力系统自动化, 2013, 37(1): 149-154. XU Fei, CHEN Lei, JIN Heping, et al. Modeling and Application Analysis of Optimal Joint Operation of Pumped Storage Power Station and Wind Power[J]. Automation of Electri Power Systems. 2013, 37(1): 149-154.
[10] 刘芳, 潘毅, 杨军峰, 等. 风电-火电-抽水蓄能联合优化机组组合模型[J]. 中国电机工程学报, 2015, 35(4): 766-775. LIU Fang, PAN Yi, YANG Junfeng, et al. Unit Commitment Model for Combined Optimization of Wind Power-Thermal Power-Pumped Storage Hydro [J]. Proceedings of the CSEE. 2015, 35(4): 766-775.
[11] 程雄, 申建建, 程春田, 等. 大电网平台下抽水蓄能电站群短期多电网启发式调峰方法[J]. 电力系统自动化, 2014, 38(9): 53-60. CHENG Xiong, SHEN Jianjian, CHENG Chuntian, et al. A short-term heuristic method for peak operation of pumped hydroenergy storage plants between multiple power grids on bulk power grid platform[J]. Automation of Electric Power Systems, 2014, 38(9): 53-60.
[12] 唐海华, 黄春雷, 丁杰. 混合式抽水蓄能电站优化调度策略[J]. 电力系统自动化, 2011, 35(21): 40-45. TANG Haihua, HUANG Chunlei, DING Jie. Assessment of available transfer capability considering uncertainties of distributed generator[J]. Automation of Electric Power Systems, 2011, 35(21): 40-45.
[13] Prabha Kundur. 电力系统稳定与控制[M]. 北京: 中国电力出版社,2002. |