[1] 周四维,李忠炳,张晋宾. 数字化电厂的概念及实施[J]. 上海电力学院学报,2014,30(3):208-212. ZHOU Siwei, LI Zhongbing, ZHANG Jinbin. Concept and implentation of digital power plant[J]. Journal of Shanghai University of Electric Power, 2014, 30(3): 208-212. [2] 杨新民,陈丰,曾卫东,等. 智能电站的概念及结构[J]. 热力发电,2015,44(11):10-13. YANG Xinmin, CHEN Feng, ZENG Weidong, et al. Concept and structure of intelligent power stations[J]. Thermal Power Generation, 2015, 44(11): 10-13. [3] 张晋宇,郭鹏,朱赫,等. 全生命周期的数字化电厂[J]. 热力发电,2015,44(7):93-96. ZHANG Jinyu, GUO Peng, ZHU He, et al. Full life cycle based total solution for digital power plants[J]. Thermal Power Generation, 2015, 44(7): 93-96. [4] 张建玲,朱晓星,寻新,等. 超(超)临界机组智能控制系统设计[J]. 热力发电,2015,44(5):59-63. ZHANG Jianling, ZHU Xiaoxing, XUN Xin, et al. Design of PIC system for ultra-supercritical thermal power units[J]. Thermal Power Generation, 2015, 44(5): 59-63. [5] 潘凤萍,陈世和,张红福,等. 1 000 MW超超临界机组自启停控制系统总体方案设计与应用[J]. 中国电力,2009,42(10):15-18. PAN Fengping, CHEN Shihe, ZHANG Hongfu, et al. Design and application of 1 000 MW ultra supercritical unit APS system [J].Electric Power, 2009, 42(10): 15-18. [6] 潘凤萍,陈世和,陈锐民,等. 火力发电机组自启停控制技术及应用[M]. 北京:科学出版社,2011. [7] 曾文南,桑永福. 机组自启停系统的逻辑设计分析[J]. 热力发电,2012,41(6):77-79. ZENG Wennan, SANG Yongfu. Analysis of logic design for automatic procedure start-up/shut-down of units[J]. Thermal Power Generation, 2012, 41(6): 77-79. [8] 李锋,朱亚清,潘凤萍,等. 1 000 MW超超临界机组风烟系统APS功能设计与应用[J]. 电力自动化设备,2010,30(8):116-120. LI Feng, ZHU Yaqing, PAN Fengping, et al. Design and application of APS function for air and flue gas system of 1 000 MW ultra supercritical unit[J]. Electric Power Automation Equipment, 2010, 30(8): 116-120. [9] 郭萌,李旭东,宁华兵,等. 660 MW超超临界机组风机单列配置方式[J]. 电力建设,2013,34(10):76-80. GUO Meng, LI Xudong, NING Huabing, et al. Configuration of single-row fan in 660 MW ultra-supercritical unit[J]. Electric Power Construction, 2013, 34(10): 76-80. [10] 金生祥,李前宇,何奇善,等. 330 MW CFB机组一、二次风机单列布置的设计和应用[J]. 中国电力,2013,46(2):31-35. JIN Shengxiang, LI Qianyu, HE Qishan, et al. Design and application of single PA/SA fan for 330-MW CFB boilers [J]. Electric Power, 2013, 46(2): 31-35. [11] 李毅杰,孙叶柱,杨旭明,等. 汽动引风机技术在1 000 MW级机组上的应用[J]. 中国电力,2012,45(9):17-21. LI Yijie, SUN Yezhu, YANG Xuming, et al. Application of steam-driven induced draft fan to 1 000 MW units [J]. Electric Power, 2012, 45(9): 17-21. [12] 陈小强,罗志浩,尹峰,等. 背压式汽动引风机调试[J]. 中国电力,2012,45(8):59-63. CHEN Xiaoqiang, LUO Zhihao, YIN Feng, et al. Debugging for back pressure steam-driven induced-draft fan [J]. Electric Power,2012, 45(8): 59-63. [13] 黄伟,俞犇,王敦敦,等. 大型超超临界机组汽动引风机调试技术探讨[J]. 湖南电力,2015,35(1):56-59. HUANG Wei, YU Ben, WANG Dundun, et al. Discussion on commissioning technology of steam-driven induced-draft fan for large-scale ultra supercritical units[J]. Hunan Electric Power,2015, 35(1): 56-59. |