[1] 邵罡北,王玉山,刘滨. 2×300 MW直接空冷机组改造可行性研究[J]. 制冷空调与电力机械,2011,32(4):86-89. SHAO Gang-bei, WANG Yu-shan, LIU Bin. Feasibility study on reconstruction of the 2×300 MW direct air-cooled unit[J]. Refrigeration Air Conditioning & Electric Power Machinery, 2011, 32(4): 86-89. [2] 王文忠,刘振华,梁志福,等. 600 MW直接空冷机组夏季限负荷的原因及解决措施[J]. 中国电力,2008,41(1):56-59. WANG Wen-zhong, LIU Zhen-hua, LIANG Zhi-fu, et al . Causes and countermeasures for the load limit in summer for 600 MW direct air-cooling unit [J]. Electric Power, 2008, 41(1): 56-59. [3] 刘润来,李永生. 采用直接空冷和中水回用技术建设节水型火电厂[J]. 中国电力,2007,40(10):17-19. LIU Run-lai, LI Yong-sheng. To build water-saving power plant with direct air-cooling and intermediate water reuse technology [J]. Electric Power, 2007, 40(10): 17-19. [4] 康艳兵,张建国,张扬.我国热电联产集中供热发展现状、问题与建议[J]. 中国能源,2008,30(10):8-13. [5] 王振铭.我国热电联产的现状与发展[J].中国电力,1999,32(10):66-69. WANG Zhen-ming. Present status and development of cogeneration in China [J]. Electric Power, 1999, 32(10): 66-69. [6] 刘卫平,沙威,刘新利,等. 评价热电联产机组经济性的节能比分析方法[J]. 中国电力,2010,43(9):41-44. LIU Wei-ping, SHA Wei, LIU Xin-li, et al . Analytical methods of energy-saving ratio for evaluating heat and electricity co-generation unit economical efficiency [J]. Electric Power, 2010, 43(9): 41-44. [7] 王力彪,李染生,王斌,等. 基于吸收式热泵的循环水余热利用技术在大型抽凝机组热电联产中的应用[J]. 汽轮机技术, 2011,53(6):470-472. WANG Li-biao, LI Ran-sheng, WANG Bin, et al . Application of waste heat recovery technology of circulating water in thermal power plant base on absorption-type heat pump[J]. Turbine Technology, 2011, 53(6): 470-472. [8] 赵虎,闫维平,郭江龙,等. 利用吸收式热泵回收电厂循环水余热的方案研究[J]. 电力科学与工程,2012,28(8):64-69. ZHAO Hu, YAN Wei-ping, GUO Jiang-long, et al . Program of research recovering the waste heat of power plant circulating water by using the absorption heat pump[J]. Electric Power Science and Engineering, 2012, 28(8): 64-69. [9] 梁振明,王平. 国内首例600 MW机组间接空冷示范工程及技术[J]. 中国电力,2010,43(3):31-34. LIANG Zhen-ming, WANG Ping. The first domestic indirect air- cooled demonstration project of 600 MW unit and its technology research [J]. Electric Power, 2010, 43(3): 31-34. [10] 王晓琴,朱光辉. 600 MW直接空冷机组夏季运行有关问题探讨[J]. 内蒙古电力技术,2010,28(3):14-16. WANG Xiao-qin, ZHU Guang-hui. Approach on 600 MW direct air-cooled unit operation in summer [J]. Inner Mongolia Electric Power, 2010, 28(3): 14-16. [11] 曹培庆. 直接空冷汽轮机背压优化节能的潜力分析[J]. 电力学报,2011,26(5):416-421. CAO Pei-qing. Potential analysis of energy saving optimization in direct air-cooled steam turbine back pressure[J]. Journal of Electric Power, 2011, 26(5): 416-421. [12] 国家经贸委,国家发展计划委,建设部. 热电联产项目可行性研究科技规定[S]. 2001. [13] 冷树成.汽轮机低真空带采暖节能效果显著[J]. 建筑节能,2011,39(11):14-16. LENG Shu-cheng. Obvious energy-saving of heating by operating steam turbine at low vacuum [J]. Building Energy Efficiency, 2011, 39(11): 14-16. [14] 朱军. 1 000 MW超超临界直接空冷机组可行性与经济性探讨[C]//2006中国电机工程学会年会论文集.2006:689-693. [15] 周一工.中国燃煤发电节能技术的发展及前景[J].中外能源,2011,16(7):91-95. [16] 张一星,张培基. 中型抽汽供热机组特点和应用条件研究[J].中国电力,2004,37(8):10-13. ZHANG Yi-xing, ZHANG Pei-ji.Features and application study of medium size steam extraction cogeneration turbine unit [J]. Electric Power, 2004, 37(8): 10-13. [17] 段向兵,周李鹏,张明远,等. 提高直接空冷机组夏季出力的探讨[J]. 电力建设,2010,31(3):56-59. DUAN Xiang-bing, ZHOU Li-peng, ZHANG Ming-yuan, et al . Approach on improvement direct air-cooling unit sufficient power in summer [J]. Electric Power Construction, 2010, 31(3): 56-59. |