[1] 李剑辉,卢恩,王宁. 基于系统恢复时间最短的快速切负荷机组布点方案[J]. 广东电力,2013,26(5):63-66. LI Jianhui, LU En, WANG Ning. Optimal placement of FCB units for the shortest duration of a system restoration[J]. Guangdong Electric Power, 2013, 26(5): 63-66. [2] 沈丛奇,周新雅,姚峻. 火电机组FCB功能及其在电网恢复中的应用[J]. 上海电力,2007,20(3):251-254. SHEN Congqi, ZHOU Xinya, YAO Jun. FCB function of coal- fired power unites and its application in power grid restoration [J]. Shanghai Electric Power, 2007, 20(3): 251-254. [3] 罗志浩,尹峰,陈晓强,等. 国产600 MW超临界直流机组实现FCB功能的可行性研究[J]. 浙江电力,2009,28(1):16-19,44. LUO Zhihao, YIN Feng, CHEN Xiaoqiang, et al. Feasibility study of FCB on supercritical unit made inland[J]. Zhejiang Electric Power, 2009, 28(1): 16-19, 44. [4] 王立地,姚金环. FCB功能的成功应用与一种新的实现方案[J]. 自动化仪表,2004,25(6):48-52. WANG Lidi, YAO Jinhuan. Successful application of FCB and a new implementation strategy[J]. Process Automation Instrumentmation, 2004, 25(6): 48-52. [5] 田丰. 700 MW机组FCB试验分析[J]. 动力工程,2002,22(4): 1872-1874. TIAN Feng. Analysis of 700 MW generator units FCB test[J]. Power Engineering, 2002, 22(4): 1872-1874. [6] 冯伟忠. 900 MW超临界机组FCB试验[J]. 中国电力,2005,38(2):74-77. FENG Weizhong. FCB test for 900 MW supercritical unit[J]. Electric Power, 2005, 38(2): 74-77. [7] 冯伟忠. 1 000 MW超超临界机组FCB试验[J]. 中国电力,2008, 41(10): 62-66. FENG Weizhong. FCB test on 1 000 MW ultra-super critical power generation unit [J]. Electric Power, 2008, 41(10): 62-66. [8] 黄道火. 660 MW超临界机组快速切负荷试验研究[J]. 广东电力,2012,25(8): 39-43. HUANG Daohuo. Research on fast cutback testing of 660 MW supercritical units[J]. Guangdong Electric Power, 2012, 25(8): 39-43. [9] 杨建,陈忠. 发电厂单机运行机组停炉不停机的处理要点[J]. 安徽电力,2012(3):53-55. YANG Jian, CHEN Zhong. Processing point of shutdown without stopping on single unit operation in power plant[J]. Anhui Electric Power, 2012(3): 53-55. [10] 阚伟民,蔡笋,谢诞梅,等. 超超临界1 000 MW 机组甩负荷试验研究[J]. 热力发电,2011,40(5):73-76,80. KAN Weimin, CAI Sun, XIE Danmei, et al. Study on load rejection test of utral supercritical 1 000 MW unit[J]. Thermal Power Generation, 2011, 40(5): 73-76, 80. [11] 罗扬曙,刘友宽,董均宇,等. 浅析软逻辑实现汽机的甩负荷试验[J]. 云南电力技术,2011,39(1):82-83. LUO Yangshu, LIU Youkuan, DONG Junyu, et al. Analysis on the implementation of turbine load rejection test by soft-logic [J]. Yunnan Electric Power, 2011, 39(1): 82-83. [12] 谭金. 国产超临界机组实现快速切负荷的若干技术问题探讨[J]. 广东电力,2010,23(10):50-53. TAN Jin. Discussion of technical problems in FCB on homemade supercritical units[J]. Guangdong Electric Power, 2010, 23(10): 50-53. |