[1] 王小华,陈宝康,陈敏. 低NO x 燃烧器改造后飞灰可燃物高原因分析及优化调整[J]. 热能动力工程,2012,27(3):342-349. WANG Xiao-hua, CHEN Bao-kang, CHEN Min. Analysis of causes for a high combustible content of the flying ash after a reconstruction of a low NO x burner and its optimization adjustment[J]. Journal of Engineering for Thermal Energy and Power, 2012, 27(3): 342-349. [2] 陈辉,黄启龙,戴维葆,等. 国内300 MW等级电站锅炉低氮燃烧器性能比较与评价[J]. 华东电力,2013,41(5):1116-1119. CHEN Hui, HUANG Qi-long, DAI Wei-bao, et al . Comparison and evaluation of low-NO x combustor performance of 300 MW power station boiler in China[J]. East China Electric Power, 2013, 41(5): 1116-1119. [3] 屠小宝,胡伟锋,徐良,等. 国内首台600 MW对冲燃烧锅炉低NO x 燃烧技术改造[J]. 中国电力,2011,44(6):31-33. TU Xiao-bao, HU Wei-feng, XU Liang, et al . Technical retrofit of low NO x combustion for 600 MW opposed firing boiler in China [J]. Electric Power, 2011, 44(6): 31-33. [4] 徐良,徐昶,徐仲雄,等. 600 MW四角切圆燃烧锅炉低NO x 燃烧器改造[J]. 锅炉技术,2012,43(3):63-66. XU Liang, XU Chang, XU Zhong-xiong, et al . The modification of low-NO x burners in a 600 MW tangential firing boiler[J]. Boiler Technology, 2012, 43(3): 63-66. [5] 应明良,戴成峰,胡伟锋,等. 600 MW机组对冲燃烧锅炉低氮燃烧改造及运行调整[J]. 中国电力,2011,44(4):55-58. YING Ming-liang, DAI Cheng-feng, HU Wei-feng, et al . Low NO x burner retrofit and operation adjustment of 600 MW opposed wall firing boiler [J]. Electric Power, 2011, 44(4): 55-58. [6] 贾宏禄. 350 MW机组锅炉低氮燃烧改造分析[J]. 中国电力,2006,39(11):1-5. JIA Hong-lu. Retrofit and analysis on the low-NO x combustion for 350 MW unit [J]. Electric Power, 2006, 39(11): 1-5. [7] 岳峻峰,梁绍华,宁新宇,等. 600 MW超超临界锅炉墙式切圆燃烧系统的特点及性能分析[J]. 动力工程学报,2011,31(8):598-604. YUE Jun-feng, LIANG Shao-hua, NING Xin-yu, et al . Structural features and performance analysis of wall-arrangement tangential firing system for a 600 MW ultra supercritical boiler[J]. Journal of Chinese Society of Power Engineering, 2011, 31(8): 598-604. [8] 高小涛,黄磊,张恩先,等. 1 000 MW机组锅炉氮氧化合物排放影响的试验研究[J]. 热能动力工程,2010,25(2):221-225. GAO Xiao-tao, HUANG Lei, ZHANG En-xian, et al . Experimental study on the impacts of operation factors on NO x emissions from 1 000 MW utility boilers [J]. Journal of Engineering for Thermal Energy and Power, 2010, 25(2): 221-225. [9] 黄新元,刘长振,宋行强,等. 黄台电厂PM型燃烧器结构优化研究及应用[J]. 中国电力,2004,37(7):44-46. HUANG Xin-yuan, LIU Chang-zhen, SONG Xing-qiang, et al . Study on the optimum configuration of PM type burner and its application in Huangtai Power Plant [J]. Electric Power, 2004, 37(7): 44-46. [10] 马双忱,金鑫,孙云雪,等. SCR烟气脱硝过程硫酸氢铵的生成机理与控制[J]. 热力发电,2010,39(8):12-17. MA Shuang-chen, JIN Xin, SUN Yun-xue, et al . The formation mechanism of ammonium bisulfate in SCR flue gas denitrification process and control thereof [J]. Thermal Power Generation, 2010, 39(8): 12-17. [11] GB 10184—1988 电站锅炉性能试验规程[S]. [12] 邹磊,梁绍华,岳峻峰,等. 1 000 MW超超临界塔式锅炉NO x 排放特性试验研究[J]. 动力工程学报,2014,34(3):169-175,195. ZOU Lei, LIANG Shao-hua, YUE Jun-feng, et al . Experimental study on NO x Emission of a 1 000 MW ultra supercritical tower type boiler[J]. Journal of Chinese Society of Power Engineering,2014, 34(3): 169-175, 195. [13] 赵振宁,佟义英,方占岭,等. 600 MW超临界机组掺烧印尼褐煤、越南无烟煤试验研究[J]. 热能动力工程,2009,24(4):513-518. ZHAO Zhen-ning, TONG Yi-ying, FANG Zhan-ling, et al . Experimental study of mixed combustion of Indonesia-originated lignite and Vietnam-originated anthracite in a 600 MW supercritical unit [J]. Journal of Engineering for Thermal Energy and Power, 2009, 24(4): 513-518. |