1 000 kV户外型GIS现场工厂化安装方案及应用

刘建楠1, 倪向萍1, 张国强2, 阎国增1, 卞秀杰1   

  1. 1. 国家电网公司交流建设分公司,北京 100052;
    2. 华东送变电工程公司,上海 201803
  • 收稿日期:2016-06-09 出版日期:2017-02-20 发布日期:2017-02-22
  • 作者简介:刘建楠(1986—),男,吉林长春人,高级工程师,从事输变电建设管理和施工技术工作。E-mail:307700932@qq.com
  • 基金资助:
    国家电网公司科技资助项目(SGZJ0000JJJS1400634)

Industrialized Installation Process and Its Implementation of 1 000 kV Outdoor GIS in Construction Site

LIU Jiannan1, NI Xiangping1, ZHANG Guoqiang2, YAN Guozeng1, BIAN Xiujie1   

  1. 1. State Grid AC Engineering Construction Co., Beijing 100052, China;
    2. East China Power Transmission and Transformation Engineering Company, Shanghai 201803, China
  • Received:2016-06-09 Online:2017-02-20 Published:2017-02-22
  • Supported by:
    This work is supported by Science and Technology Project of State Grid Corporation of China (No. SGZJ0000JJJS1400634).

摘要: 1 000 kV GIS设备体积大、单元重、数量多,安装工作持续时间长,安装过程受外界环境影响大。为有效控制1 000 kV GIS安装条件,保证安装质量,确保施工计划的严格执行,研制了特高压GIS现场安装用全封闭移动式厂房,营造一种全封闭的工厂化安装环境,实现了1 000 kV户外型GIS在工程现场的工厂化安装。对移动厂房的基本结构进行了介绍,并重点研究了基于移动厂房的1 000 kV户外型GIS现场工厂化安装方案。该方案已成功应用于皖电东送工程、浙北—福州工程,取得了非常好的应用效果,并已经确定将在后续所有特高压交流工程中普遍推广。

关键词: 超/特高压, 特高压交流, 1 000 kV GIS安装, 移动厂房, 安装方案, 工厂化安装, 安装流程

Abstract: 1 000 kV GIS equipment is very large, heavy and has large number of units. Its installation process typically lasts long and is easily influenced by external environment. In order to ensure installation quality and strict implementation of construction plan, State Grid AC Engineering Construction Corporation has developed a totally-enclosed self-assembly building for UHV GIS installation, which creates a completely closed factory installation environment in construction site and realizes industrialized installation of 1 000 kV outdoor GIS. The main structure of self-assembly building is introduced first. Then the industrialized installation process of 1 000 kV outdoor GIS in construction site is discussed based on the self-assembly building. The installation process has been successfully applied to Anhui-East project and Zhebei-Fuzhou project and achieved very good application results. The process has been selected to popularize in all subsequent UHV AC projects.

Key words: EHV/UHV, UHV AC, 1 000 kV GIS installation, self-assembly building, installation program, industrialized installation, installation procedure