[1] 中国电力企业联合会,全国电力供需与经济运行形势分析预测报告(2010-2011 年度),2011.1. [2] The European Wind Energy Association, Wind in power: 2011 European statistics, 2012.2. [3] 孙荣富,张涛,梁吉. 电网接纳风电能力的评估及应用[J]. 电力系统自动化,2011,35(4):70-76. SUN Rong-fu, ZHANG Tao, LIANG Ji. Evaluation and application of wind power integration capacity in power grid [J]. Automation of Electric Power Systems, 2011, 35(4): 70-76. [4] P A Ruiz, C R Philbrick, E Zak, et al. Uncertainty management in the unit commitment problem[J]. IEEE Trans on Power Systems, 2009, 24(2): 642-651. [5] 张智刚,夏清. 智能电网调度发电计划体系架构及关键技术[J].电网技术,2009,33(20):1-8. ZHANG Zhi-gang, XIA Qing. Architecture and key technologies for generation scheduling of smart grid[J]. Power System Technology, 2009, 33(20): 1-8. [6] 王彩霞,鲁宗相. 风电功率预测信息在日前机组组合中的应用[J]. 电力系统自动化,2011,35(7):13-18. WANG Cai-xia, LU Zong-xiang. Unit commitment based on wind power forecast [J]. Automation of Electric Power Systems, 2011,35(7): 13-18. [7] 耿建,徐帆,姚建国,等. 求解安全约束机组组合问题混合整数规划算法性能分析[J]. 电力系统自动化,2009,33(21):24-27. GENG Jian, XU Fan, YAO Jian-guo, et al. Performance analysis of mixed-integer programming based algorithm for security constrained unit commitment [J]. Automation of Electric Power Systems, 2009, 33(21): 24-27. [8] 李利利,耿建,姚建国,等. 均衡发电量调度模式下的SCED模型和算法[J]. 电力系统自动化,2010,34(15):28-30. LI Li-li, GENG Jian, YAO Jian-guo, et al. Model and algorithm for security constrained economic dispatch in equilibrium power generation dispatching mode[J]. Automation of Electric Power Systems, 2010, 34(15): 28-30. [9] Lei M, L Shiyan, J Chuan. A review on the forecasting of wind speed and generated power [J]. Renewable and Sustainable Energy Reviews, 2009, 13(3): 915-920. [10] 牛东晓,范磊磊. 风电功率预测方法综述及发展研究[J]. 现代电力,2013,30(4):24-28. NIU Dong-xiao, FAN Lei-lei. Review and development study on wind power prediction methods [J]. Modern Electric Power, 2013, 30(4): 24-28. [11] Taylor J W, McSharry P E, Buizza R. Wind power density forecasting using ensemble predictions and time series models [J]. IEEE Trans on Energy Conversion, 2009, 24(3): 775-782. [12] 范高峰,王伟胜,刘纯,等. 基于人工神经网络的风电功率预测[J]. 中国电机工程学报,2008,28(14):118-123. FAN Gao-feng, WANG Wei-sheng, LIU Chun, et al. Wind power prediction based on artificial neural network[J]. Proceedings of Electric the CSEE, 2008, 28 (34): 118-123. [13] Andrew Kusiak, H Zheng, Z Song. Short-term prediction of wind farm power: a data mining approach[J]. IEEE Trans on Energy Conversion, 2009, 24(1): 125-136. [14] S Kani, M Ardehali. Very short-term wind speed prediction: a new artificial neural network-Markov chain model[J]. Energy Conversion and Management, 2011, 52(3): 738-745. [15] F Cassola, M Burlando. Wind speed and wind energy forecast through Kalman filtering of numerical weather prediction model output [J]. Applied Energy, 2012, 99(1): 154-166. [16] 刘纯,范高峰,王伟胜,等. 风电场输出功率的组合预测模型[J]. 电网技术,2009,33(13):74-79. LIU Chun, FAN Gao-feng, WANG Wei-sheng, et al. A combination forecasting model for wind farm output power [J]. Power System Technology, 2009, 33(13): 74-79. [17] 王彩霞,鲁宗相,乔颖,等. 基于非参数回归模型的短期风电功率预测[J]. 电力系统自动化,2010,34(16):78-82. WANG Cai-xia, LU Zong-xiang, QIAO Ying, et al. Short-term wind power forecast based on non-parametric regression model [J]. Automation of Electric Power Systems, 2010, 34(16): 78-82. [18] H Mori, E Kurata. Application of gaussian process to wind speed forecasting for wind power generation[C]. Proceedings of IEEE Conference on Sustainable Energy Technologies, Nov 24-27, 2008, 956-959. [19] M Lange. Analysis of the uncertainty of wind power predictions [D]. Odenburg, Germany: University of Odenburg, 2003. [20] H Bludszuweit, A Llombart. Statistical analysis of wind power forecast error[J]. IEEE Trans on Power Systems, 2008, 23(3):983-991. [21] Juban J, Siebert N, Kariniotakis G. Probabilistic short-term wind power forecasting for the optimal management of wind generation [C]. Proceedings of IEEE Conference on Power Tech, July 1-5, 2007, 683-688. [22] Methaprayoon K, Yingvivatanapong C. An integration of ANN wind power estimation into unit commitment considering the forecasting uncertainty [J]. IEEE Trans on Industry Applications, 2007, 27(6): 1441-1448. [23] Lee T Y. Optimal spinning reserve for a wind-thermal power system using EIPSO[J]. IEEE Trans on Power Systems, 2007, 22(4): 1612-1621. [24] Doherty R, O’malley M. A new approach to quantity reserve demand in systems with significant installed wind capacity [J]. IEEE Trans on Power Systems, 2007, 22(4): 1612-1621. [25] 王丹平,陈之栩,涂孟夫,等. 考虑大规模风电接入的备用容量计算[J]. 电力系统自动化,2012,36(21):24-28. WANG Dan-ping, CHEN Zhi-xu, TU Meng-fu, et al. Reserve capacity calculation considering large-scale wind power integration[J]. Automation of Electric Power Systems, 2012, 36 (21): 24-28. [26] WU Lei, M. Shahidehpour, LI Tao. Stochastic security constrained unit commitment [J]. IEEE Trans on Power Systems, 2007, 22(2):800-811. [27] Bouffard F, Galiana F D. Stochastic security for operations planning with significant wind power generation [J]. IEEE Trans on Power Systems, 2008, 23(2): 306-316. [28] Chen C L. Optimal wind-thermal generating unit commitment [J]. IEEE Trans on Energy Conversion, 2008, 23(1): 273-280. [29] Tuohy A, Meibom P, Denny E, et al. Unit commitment for systems with significant wind penetration[J]. IEEE Trans on Power Systems, 2009, 24(2): 592-601. [30] WANG J H, M. Shahidehpour, LI Z Y. Security constrained unit commitment with volatile wind power generation[J]. IEEE Trans on Power Systems, 2008, 23(3): 1319-1327. [31] 叶荣,陈皓勇,王钢,等. 多风电场并网时安全约束机组组合的混合整数规划解法[J]. 电力系统自动化,2010,34(5):29-33. YE Rong, CHEN Hao-yong, WANG Gang, et al. A mixed integer programming method for security constrained unit commitment with multiple wind farms[J]. Automation of Electric Power Systems, 2010, 34(5): 29-33. [32] A Ben-Tal, A. Nemirovski. Robust optimization: methodology and applications, Math. Program. Ser B, 2002, 92: 452-480. [33] D. Bertsimas, E. Litvinov, X. Sun, et al. Adaptive robust optimization for the security constrained unit commitment problem [J]. IEEE Trans on Power Systems, 2013, 28(1): 52-63. [34] R. Jiang, J. Wang, Y. Guan. Robust unit commitment with wind power and pumped storage hydro[J]. IEEE Trans on Power Systems, 2012, 27(2): 800-810. [35] L Zhao, B Zeng. Robust unit commitment problem with demand response and wind energy [C]. Proceedings of IEEE PES General Meeting, 2012, 1-8. [36] 魏韡,刘锋,梅生伟. 电力系统鲁棒经济调度:(一)理论基础[J]. 电力系统自动化,2013,37(17):37-43. WEI Wei, LIU Feng, MEI Sheng-wei. Robust and economical scheduling methodology for power systems part one theoretical foundation[J]. Automation of Electric Power Systems, 2013, 37(17): 37-43. [37] 魏韡,刘锋,梅生伟. 电力系统鲁棒经济调度:(二)应用实例[J]. 电力系统自动化,2013,37(18):60-67. WEI Wei, LIU Feng, MEI Sheng-wei. Robust and economical scheduling methodology for power systems part two application examples [J]. Automation of Electric Power Systems, 2013, 37(18): 60-67. [38] 裴哲义,董存,辛耀中. 我国风电并网运行最新进展[J]. 中国电力,2010,43(6):78-82. PEI Zhe-yi, DONG Cun, XIN Yao-zhong. Review of operation and management of integrating wind power in China[J]. Electric Power, 2010, 43(6): 78-82. [39] 李明节. 基于国际先进技术的风电调度研究与实践[J]. 中国电力,2012,45(11):1-6. LI Ming-jie. Research and practice of wind power dispatch based on international advanced experience [J]. Electric Power, 2012, 45(11): 1-6. [40] Z Gao, J Geng, K Zhang, et al. Wind power dispatch supporting technologies and its implementation[J]. IEEE Trans on Smart Grid, 2013, 4(3): 1684-1691. |