中国电力 ›› 2012, Vol. 45 ›› Issue (9): 29-34.DOI: 10.11930/j.issn.1004-9649.2012.9.29.5

• 电网 • 上一篇    下一篇

500 kV同塔四回线路不全停运检修作业方式研究

金逸1, 肖匀2, 刘庭3, 刘凯3, 肖宾3   

  1. 1. 江苏省电力公司,江苏 南京 210024;
    2. 无锡供电公司,江苏 无锡 214061;
    3.中国电力科学研究院,湖北 武汉 430074
  • 收稿日期:2012-06-27 出版日期:2012-09-18 发布日期:2016-02-29
  • 作者简介:金逸(1977-),男,江苏昆山人,工程师,从事调度运行和科技管理工作。

Study on Circuit Service Without Total Outage of the 500 kV Transmission Line of Four Circuits on One Tower

JIN Yi1, XIAO Yun2, LIU Ting3, LIU Kai3, XIAO Bin3   

  1. 1. Jiangsu Electric Power Company, Nanjing 210024, China;
    2. Wuxi Power Supply Company, Wuxi 214061, China;
    3. China Electric Power Research Institute, Wuhan 430074, China
  • Received:2012-06-27 Online:2012-09-18 Published:2016-02-29

摘要: 为了给500 kV同塔四回线路不全停运时的检修作业提供技术依据,通过仿真计算的方法,分别计算了500 kV同塔四回线路,在两回运行两回停运、三回运行一回停运的情况下,在停运回路上的感应电压情况。计算结果发现,在500 kV同塔四回线路不全停运时,在停运线路两端均不接地的情况下,停运线路上的感应电压峰值最大可达105 kV;在停运线路两端均接地的情况下,停运线路上的感应电压峰值最大可达95 V。根据计算及分析结果,提出了500 kV同塔四回线路不全停运时的检修作业可采用带电作业方式或停电作业方式并需采取相应的安全防护措施。

关键词: 500 kV, 同塔四回线路, 不全停运, 感应电压, 检修作业

Abstract: In order to provide a technical basis for circuit service without total outage of the 500 kV transmission line of four circuits on one tower, the induced voltage of outage circuits were calculated by simulation under the condition of two circuits operating while the other two outage, or three circuits operating while the other one outage. The calculation result indicates that when the two ends of outage circuits is ungrounded, the max peak value of the induced voltage of outage circuits can reach as high as 105 kV; when the two ends of outage circuits is grounded, the max peak value of the induced voltage of outage circuits can also reach as high as 95 V. It is proposed that, when the 500 kV four circuits on one tower is incomplete outage, the service operation can be live working, or power-off working with safety protective measures.

Key words: 500 kV, four circuits on one tower, incomplete outage, induced voltage, service operation